FORMATION HYDRAULICFRACTURING Russian patent published in 2017 - IPC E21B43/267 

Abstract RU 2612417 C1

FIELD: mining.

SUBSTANCE: method involves lowering to a well of a pipe string, pumping of a gelled fluid via the pipe string into the productive formation interval with the formation of fractures, fixing of fractures by pumping of gelled fluid with proppant covered with a rubber sheet. In addition a drill is lowered on the pipe string to the production well to the formation sole, pairs of perforations along the well perimeter are made upwards where each perforations pair is shifted at an angle. After drilling the pipe string with the drill is removed from the well. Then the pipe string with a packer is lowered to the well, the packer is seated in the well, formation hydraulicfracturing is made with pumping of gelled fluid with formation of fractures. Further, a crosslinked hydrocarbon-based gel rim is pumped into the fracture in the amount of 0.2 of the volume of the pumped gelled fluid. Fixing of fractures is performed in two stages. The volume of the remaining gelled fluid is divided into two equal parts, and fixing of the fracture is performed with proppant 20/40 and 12/18, covered with a rubber-polymer composition, in equal shares by weight at both stages. At the first stage the fracture is fixed by pumping the first part of the gelled fluid with proppant 20/40, covered with the rubber-polymer composition, and at the second stage the fracture is fixed with the second part of the gelled fluid with proppant 12/18, covered with the rubber-polymer composition.

EFFECT: improvement of the formation hydraulicfracturing efficiency and reliability.

1 tbl, 5 dwg

Similar patents RU2612417C1

Title Year Author Number
METHOD OF HYDRAULIC FORMATION FRACTURING 2016
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2618545C1
METHOD OF HYDRAULIC BREAKDOWN OF FORMATION 2016
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
  • Girfanov Ildar Ilyasovich
RU2613682C1
FORMATION HYDRAULICFRACTURING 2015
RU2612418C1
INTERVAL HYDRAULIC FRACTURING OF CARBONATE FORMATION IN HORIZONTAL WELLBORE WITH BOTTOM WATER 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Girfanov Il'Dar Il'Jasovich
  • Mansurov Ajdar Ul'Fatovich
RU2558058C1
METHOD OF MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN OPEN INCLINED WELL HOLE 2017
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2667561C1
METHOD OF INTENSIFICATION OF WELL OPERATION AFTER ITS CONSTRUCTION 2019
  • Ismagilov Fanzat Zavdatovich
  • Lutfullin Azat Abuzarovich
  • Khusainov Ruslan Fargatovich
RU2724705C1
METHOD FOR HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL 2016
RU2613403C1
METHOD OF HYDRAULIC FRACTURING OF A RESERVOIR 2016
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
  • Guskova Irina Alekseevna
  • Mannanov Ildar Ilgizovich
  • Garipova Liliya Ilyasovna
RU2644807C1
METHOD FOR HYDRAULIC FRACTURING OF PRODUCTIVE FORMATION WITH CLAY LAYER AND GAS-BEARING HORIZON 2016
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2618544C1
HYDROFRACTURING METHOD FOR FORMATION IN WELL 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Girfanov Il'Dar Il'Jasovich
RU2571964C1

RU 2 612 417 C1

Authors

Dates

2017-03-09Published

2015-12-23Filed