FIELD: mining engineering.
SUBSTANCE: method for investigating wells comprises a first provision stage for providing a drilling tool (1) comprising at least one drill rod (2) and a drill bit assembly (3), a second provision stage for providing a well investigation tool comprising a sensor device (1), a drilling stage for drilling the well (6) with the drilling tool (1) by means of a drilling process (6) by means of well investigation tool to obtain well data (6), and a processing stage for processing the well data (6) with a data device (7) to obtain well condition data. The drilling tool (1) comprising a central flushing channel for feeding the flushing fluid to the drill bit assembly (3) is used, and the well investigation tool is placed in the central flushing channel in such a way that it is possible to flow around the flushing fluid in the central flushing channel for the well investigation tool.
EFFECT: providing cooling and protecting the investigation tool during drilling.
32 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
DRILLING BIT ASSEMBLY UNIT | 2003 |
|
RU2329369C2 |
DRILLING TOOL FOR DIRECTIONAL WELLS DRILLING WITH AUTOMATIC CONTROL | 2017 |
|
RU2722611C2 |
METHOD AND DEVICE FOR DATA COLLECTION ON WELL CHARACTERISTICS IN PROCESS OF DRILLING | 2004 |
|
RU2330158C2 |
DOWNHOLE VIBRATING DEVICE | 2018 |
|
RU2726805C1 |
DRILLING ASSEMBLY | 2011 |
|
RU2585779C2 |
DRILL BIT FOR PERCUSSION DRILLING, DRILLING SYSTEM INCORPORATING SUCH DRILL BIT AND WELL-BORING METHOD | 2004 |
|
RU2332553C2 |
METHOD FOR FORCING FLUID SUBSTANCE INTO BOREHOLE INTO ZONE IN FRONT OF DRILLING BIT | 2002 |
|
RU2287662C2 |
SHOCK ABSORBER FOR DRILL-STEMS | 2013 |
|
RU2625057C1 |
HOLE DRILLING MACHINE | 1999 |
|
RU2166057C2 |
DEVICE FOR WELL DRILLING IN COMPLICATED BED | 2010 |
|
RU2439276C1 |
Authors
Dates
2018-01-09—Published
2013-09-05—Filed