FIELD: oil and gas industry.
SUBSTANCE: method includes drilling a horizontal wellbore interval "drawdown", lowering the casing string. After the casing string has reached the depth of the production string shoe, the descent is stopped, an intermediate washing with drilling fluid is carried out with simultaneous controlled supply of nitrogen till the values of hydrostatic pressure are stabilised at the level of formation pressure values to form equilibrium in the "well-formation" system. Then under conditions of formed equilibrium, running of the casing string to the planned well bottom is continued.
EFFECT: increased efficiency of oil and gas deposits development in a complex cavernous-fractured carbonate oil-saturated formation.
1 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR LOWERING A CASING COLUMN INTO HORIZONTAL SHAFTS OF A LARGE LENGTH UNDER CONDITIONS OF DIFFERENTIAL CLAMPING | 2019 |
|
RU2714414C1 |
METHOD FOR DETERMINING HORIZONTAL SHAFT MAXIMUM LENGTH IN CONDITIONS OF CAVERN-FRACTURED CARBONATE OIL AND GAS-SATURATED FORMATION WITH ABNORMALLY LOW FORMATION PRESSURE | 2015 |
|
RU2617820C2 |
METHOD FOR RAPID ISOLATION OF ABSORBING ZONE IN WELL WITH HIGH-FLOW INTER-COMPARTMENT FLOW FROM SUPERHIGH STRATUM SATURATED WITH STRONG BRINES, AND PACKER EQUIPMENT FOR IMPLEMENTATION THEREOF | 2020 |
|
RU2741978C1 |
METHOD OF DRILLING WELLS AND DEVELOPMENT OF MULTIBED DEPOSITS OF HYDROCARBONS WITH NON-UNIFORM GEOLOGICAL CONDITIONS OF BED ATTITUDES | 2008 |
|
RU2370640C1 |
METHOD FOR PRIMARY OPENING BY DRILLING OF HORIZONTAL SHAFT IN FRACTURE TYPE OF OIL AND GAS SATURATED CARBONATE RESERVOIR UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2015 |
|
RU2602437C1 |
WELL COMPLETION METHOD IN CONDITIONS OF ABNORMALLY HIGH FORMATION PRESSURE | 2023 |
|
RU2821629C1 |
METHOD FOR OPENING HIGH-PRESSURE FORMATIONS SATURATED WITH STRONG BRINES | 2020 |
|
RU2735504C1 |
METHOD FOR INITIAL EXPOSING OF COMPLEX CAVERNOUS-FRACTURE OF CARBONATE OIL AND GAS SATURATED FORMATION WITH HORIZONTAL SHAFT OF LONG LENGTH | 2015 |
|
RU2598268C1 |
OPENING METHOD OF HIGH-PRESSURE STRATUMS, SATURATED BY STRONG BRINES | 2007 |
|
RU2365735C2 |
METHOD FOR WELL DRILLING AND DEVELOPMENT OF MULTIHORIZON HYDROCARBON FIELD CHARACTERIZED BY NON-UNIFORM GEOLOGICAL CONDITIONS OF PRODUCTIVE BED ATTITUDES | 2006 |
|
RU2295632C1 |
Authors
Dates
2018-01-12—Published
2017-03-23—Filed