FIELD: construction.
SUBSTANCE: in method for producing a grouting fluid, which includes the mixing of cement, fly ash and bentonite followed by mixing with water mixing and liquid glass, use the fly ash from the combustion of fuel oil. The content of the components in wt % is cement 30-60, bentonite powder 3.3-5.0, fuel oil 15-55, and liquid glass with a density of 1.3-1.45 g/cm3 is used in an amount of 2.5-5% by volume. Mixing with the water of mixing is carried out with a water-hard ratio V/T 2-1.
EFFECT: obtaining a cheaper oil-well mortar by replacing the cement with ash from the combustion of fuel oil, acceleration of the setting and hardening of the ash-bentonite-cement mixture, increase the strength and stability of the properties of the composite solution, expand the area of utilization of wastes of man-made origin.
1 ex, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ERECT UNDERGROUND MINE WITH SHIELD TUNNELLING | 2011 |
|
RU2476675C2 |
METHOD FOR PREPARATION OF PLUGGING-BACK COMPOUND | 0 |
|
SU1756537A1 |
EXPANDING GROUTING MORTAR | 0 |
|
SU1571220A1 |
EXPANDING GROUTING MORTAR ( VARIANTS ) | 2001 |
|
RU2222688C2 |
FOAMING GROUTING MORTAR AND METHOD OF MANUFACTURING SAME | 0 |
|
SU1578359A1 |
MOULDING MIXTURE | 2011 |
|
RU2450886C1 |
PLUGGING COMPOSITION | 0 |
|
SU1133379A1 |
GYPSUM BINDING AGENT | 2005 |
|
RU2285677C1 |
METHOD OF TREATING ASH BEFORE REMOVING TO DUMP | 0 |
|
SU1629696A1 |
METHOD FOR PREPARATION OF GROUTING MORTAR FOR INSULATION AND PREVENTION OF EARTHFALLS IN CAVERNOUS PART OF SHAFT OF WELLS, AND MAINLY GENTLY SLOPING AND HORIZONTAL ONES | 2012 |
|
RU2489468C1 |
Authors
Dates
2018-02-27—Published
2016-05-12—Filed