FIELD: construction.
SUBSTANCE: invention relates to prefabricated bridges and bridge structures. Tracked-prefabricated bridge for passing loads of light weight category includes four ramps, four shore sections, ten middle sections with a demountable carriageway, all of the listed elements are assembled into two identical tracks interconnected by cross-linkages. Set of the bridge is compact during transportation due to division into composite elements and the removed roadway of the middle sections. There are handles for easy carrying on the component elements of the bridge, the maximum load, when carrying one element of the bridge foursome, is not more than 25 kg.
EFFECT: decrease of the maximum load, while carrying one element of the bridge foursome.
1 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
BRIDGE CONSTRUCTION AND BRIDGE ASSEMBLY MACHINE FOR TRANSPORTATION, ASSEMBLY AND LAYING OF BRIDGE CONSTRUCTION ON OBSTACLE | 2001 |
|
RU2210656C2 |
LIFTING FRAME FOR INSTALLATION OF PANEL BRIDGE FOR PASSING LOAD OF LIGHT-WEIGHTED CATEGORY | 2017 |
|
RU2680157C2 |
SPAN STRUCTURE | 2016 |
|
RU2650980C2 |
COASTAL PART OF BRIDGE OF MECHANIZED COMPLEX | 2020 |
|
RU2743552C1 |
MECHANISM FOR FIXING THE FOLDING RAMPS OF THE TRACK SECTIONS OF THE BRIDGE BLOCK OF A MECHANIZED BRIDGE | 2022 |
|
RU2787508C1 |
POWER-ASSISTED BRIDGE COMPLEX | 2008 |
|
RU2385980C1 |
FOLDING BRIDGE UNIT | 2020 |
|
RU2750918C1 |
BRIDGE BLOCK OF SPAN | 2019 |
|
RU2724815C1 |
DISMOUNTABLE METAL BRIDGE | 2011 |
|
RU2476635C1 |
UNIFIED BRIDGE COMPLEX | 2001 |
|
RU2212489C2 |
Authors
Dates
2018-07-10—Published
2016-06-14—Filed