FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil industry, in particular, to methods of development of oil producing wells. Method of development of oil producing well includes stages of acid treatment of bottomhole zone of well, at which acid solution is pumped to bottomhole zone of well, waiting period of reaction time of acid solution with rock of bottomhole zone, on which the swab stopper is laid on tubing string at depth of 5–10 meters above artificial or current working face, lowering swab into well, taking fluid from well at least 1 volume of production string +1.5 of volume of working liquids pumped into formation, at that said fluid moves from perforation interval downwards via tube and then via shoe upward along tubing string and is removed both from formation and from well sump.
EFFECT: preservation of reservoir properties of formation, preservation of production capabilities of well, complete removal of acid and its reaction products after treatment of bottomhole formation zone, regardless of formation and interval intake capacity, reduction of time and energy costs for process of development of oil producing well, minimization of corrosion of downhole equipment.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR DEVELOPMENT OF OIL PRODUCING WELL AND DEVICE FOR ITS IMPLEMENTATION | 2015 |
|
RU2614832C2 |
METHOD FOR CLEANING THE BOTTOMHOLE FORMATION ZONE OF A WELL | 2021 |
|
RU2775368C1 |
METHOD OF CLEANING BOTTOMHOLE ZONE OF FORMATION OF INJECTION WELL | 2015 |
|
RU2604891C1 |
METHOD FOR DEVELOPMENT OF OIL PRODUCING WELL AND DEVICE THEREFOR | 2015 |
|
RU2614139C1 |
METHOD FOR PERFORATING A WELL AND PROCESSING A BOTTOM-HOLE CARBONATE FORMATION ZONE | 2017 |
|
RU2656255C1 |
DEVELOPMENT METHOD OF MULTI-HOLE BRANCHED HORIZONTAL WELLS | 2011 |
|
RU2459945C1 |
DEVELOPMENT METHOD OF MULTI-HOLE BRANCHED HORIZONTAL WELLS | 2011 |
|
RU2459941C1 |
METHOD FOR DEVELOPMENT OF MULTI-HOLE BRANCHED HORIZONTAL WELL | 2014 |
|
RU2581589C1 |
METHOD FOR PERFORMING PULSE HYDRAULIC FRACTURING OF CARBONATE FORMATION | 2011 |
|
RU2460876C1 |
METHOD FOR BOTTOMHOLE ZONE TREATMENT | 2012 |
|
RU2512222C1 |
Authors
Dates
2019-08-26—Published
2018-07-13—Filed