FIELD: oil, gas and coke-chemical industries.
SUBSTANCE: group of inventions relates to oil and gas industry, in particular to valve devices in circulation systems of drilling mud during well drilling. Activation mechanism comprises at least one sensor to measure the pressure of the drilling fluid in the first fluid pipe in the circulating sub, control unit connected to sensor to monitor received sensor signal. Control unit is configured to electronically activate movement of at least one movable valve element in one direction based on the received signal. Valve element is configured to be positioned relative to at least a second fluid pipe in the circulation adapter and is movable between an open position and a closed position. Fluid medium pipe is communicated via fluid medium with first fluid medium pipe. Valve element comprises at least one end configured to close the second fluid pipe in the closed position and open the second fluid pipe in the open position. Control unit is electrically connected to at least one actuator unit located relative to at least one valve element. Actuator unit is configured to reciprocate at least one valve element between an open position and a closed position an unlimited number of times, wherein control unit is further configured to electronically activate movement of at least one movable valve element in opposite direction an unlimited number of times.
EFFECT: simplified design, increased safety, reduced time costs, fast and accurate activation of downhole tool.
15 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
CIRCULATION VALVE OF A DRILL STRING | 2021 |
|
RU2774306C1 |
CIRCULATION VALVE OF DRILL COLUMN | 2015 |
|
RU2599120C1 |
DRILL STRING CIRCULATION VALVE | 2018 |
|
RU2681774C1 |
CIRCULATION VALVE OF DRILL COLUMN | 2018 |
|
RU2682271C1 |
CIRCULATION SYSTEM TO RAISE DRILL STRING ASSEMBLY BOTTOM IN PROCESS OF DRILLING ON CASING STRING | 2009 |
|
RU2496967C2 |
METHOD OF INCREMENT FLUID OVERFLOW INITIATION BY PRINCIPLE OF COMMUNICATING VESSELS TO RAISE DRILL STRING BOTTOM LAYOUT DURING DRILLING IN CASING STRING | 2009 |
|
RU2495992C2 |
CONTROL OF REVERSE FLOW PRESSURE IN PROCESS OF RAISING DRILL STRING ASSEMBLY BOTTOM | 2009 |
|
RU2496965C2 |
FLUID FLOW MONITORING UPON DRILL STRING BOTTOM LAYOUT RAISING DURING OPERATION IN CASING STRING | 2009 |
|
RU2495993C2 |
LIFTING TOOL WITH WEDGE GRIPS TO RAISE DRILL STRING ASSEMBLY BOTTOM IN PROCESS OF DRILLING OPERATIONS ON CASING STRING | 2009 |
|
RU2496966C2 |
DOWNHOLE TOOL FOR FLUID MEDIUM CIRCULATION IN WELL SHAFT, CIRCULATION SYSTEM OF FLUID MEDIUM IN WELL SHAFT AND CIRCULATION METHOD OF FLUID MEDIUM IN WELL SHAFT (VERSIONS) | 2008 |
|
RU2440482C1 |
Authors
Dates
2020-01-17—Published
2015-11-20—Filed