FIELD: oil and gas industry.
SUBSTANCE: group of inventions relates to sealing of holes, cracks or points of leaks through connections at the point of damage in underground tubing string. Device is assembled along 4 sections with total length within 2.00 m to 3.00 m and diameter ranging from 70 mm to 80 mm, and comprises upper section, which comprises one upper cylinder and upper means for movement, an extension section, which comprises upper piston, upper sealing means located in upper part of upper piston, one extension pipe, to upper part of which upper piston is attached by means of two mounting bolts, and lower part of which is connected to central section, and one lower adapter, connecting lower part of extension section with central section. Central section comprises central cylinder, lower means for displacement. Lower part of the central section is connected to the case of the lower piston. Lower section comprises lower piston housing, lower part of which contains two mounting bolts, one lower cylinder, one lower piston, lower sealing means, one sliding cone and attachment means, which contain one body and two wedges.
EFFECT: simplified sealing technology, increased safety, reduced time costs.
19 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDRAULIC PUMP SMART DEVICE FOR OIL PRODUCTION AND DATA ACQUISITION FROM WELL BOTTOM | 2012 |
|
RU2544212C1 |
GAS GENERATOR FOR OIL AND GAS WELLS | 2010 |
|
RU2456443C1 |
EJECTOR FOR IMPROVING FLOW SUPPLY CONDITIONS IN BOREHOLES AND DURING TRANSPORTATION OF CRUDE OIL FROM SURFACE STORAGE TANKS | 2018 |
|
RU2772392C1 |
GAS SEPARATOR AND METHOD OF ITS OPERATION | 2000 |
|
RU2193652C2 |
GAS SEPARATOR WITH AUTOMATIC LEVEL CONTROL | 2001 |
|
RU2272906C2 |
METHOD AND DEVICE FOR INITIATING INFLOW FROM STRATUM | 1993 |
|
RU2065948C1 |
DEVICE TO APPLY REPEATED HYDROIMPULSIVE ACTION TO BOTTOMHOLE FORMATION ZONE | 2004 |
|
RU2299306C2 |
OIL PRODUCTION METHOD WITH FORCE APPLICATION TO RESERVOIR AND DOWNHOLE EQUIPMENT FOR ABOVE METHOD REALIZATION | 2004 |
|
RU2285788C2 |
FORMATION IN THE WELL INTERVAL BY INTERVAL MULTI-STAGE HYDRAULIC FRACTURING PERFORMANCE METHOD AND A DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2682391C1 |
METHOD FOR PULSED WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2310059C1 |
Authors
Dates
2020-07-30—Published
2016-12-15—Filed