METHOD OF HYDRAULIC FRACTURING AT LATE STAGE OF MINE WORKING Russian patent published in 2020 - IPC E21B43/26 

Abstract RU 2733561 C2

FIELD: oil, gas and coke-chemical industries.

SUBSTANCE: invention relates to oil industry, in particular to methods of increasing oil recovery of formation by formation of cracks or breaks. Method includes extraction of formation products through production wells with control of volumes of extraction of formation products, pumping of working agent through injection wells with excess of pumping volumes above sampling, isolation of absorption zones and the most permeable sections of the formation by means of the colmatage composition at increased watering of the extracted product in the injection wells and performance of the fracturing in the well. Geophysical investigation of average length of fracture during formation fracturing. Time-constant material is injected into the injection well by the colmatage composition to form a screen with radius of not more than 1/4 and not less than 1/8 of the fracture average length during fracturing. Fracturing is performed in injection well after curing of cement mortar.

EFFECT: proposed from the method of hydraulic fracturing of the formation at the late stage of development allows reducing the costs for injection into operation of injection wells after isolation of absorption zones and most permeable sections with the colmatage composition, exclude probability of recovery of permeability of formation zones and absorption zones and involvement in development of previously undrained sections of formation by setting impermeable screen from hardened cement mortar (cement stone) around injection well after pumping colmatage composition and performing fracturing after cementing cement.

1 cl

Similar patents RU2733561C2

Title Year Author Number
METHOD OF OIL-POOL DEVELOPMENT 2007
  • Baturin Anton Jur'Evich
  • Baturin Jurij Efremovich
  • Sonich Vladimir Pavlovich
RU2337234C1
METHOD OF DEVELOPMENT OF OIL POOL IN CARBONATE RESERVOIRS OF FRACTURED-POROUS TYPE 2000
  • Jusupov I.G.
  • Abdulmazitov R.G.
  • Khisamov R.S.
  • Kandaurova G.F.
  • Nasybullin A.V.
RU2204703C2
METHOD FOR DEVELOPMENT OF OIL DEPOSIT 1993
  • Rudakov A.M.
  • Muslimov R.Kh.
  • Khisamov R.S.
  • Kandaurova G.F.
RU2085710C1
METHOD FOR DEVELOPMENT OF OIL DEPOSIT 1995
  • Ajduganov V.M.
  • Rudakov A.M.
  • Starshov M.I.
RU2085714C1
METHOD FOR DEVELOPMENT OF MULTI-BED OIL DEPOSITS 1996
  • Muslimov R.Kh.
  • Rudakov A.M.
  • Sulejmanov Eh.I.
  • Khisamov R.S.
  • Kandaurova G.F.
  • Ivanov A.I.
  • Khannanov R.G.
  • Junusov Sh.M.
  • Fajzullin I.N.
RU2113590C1
METHOD FOR OIL DEPOSIT DEVELOPMENT 2021
  • Zemtsov Yurij Vasilevich
  • Mazaev Vladimir Vladimirovich
RU2777820C1
METHOD OF OIL POOL DEVELOPMENT BY HORIZONTAL WELLS WITH MULTIPLE HYDRAULIC FRACTURING 2013
  • Khisamov Rais Salikhovich
  • Salikhov Ilgiz Misbakhovich
  • Akhmetgareev Vadim Valer'Evich
RU2528309C1
METHOD FOR DEVELOPMENT OF HETEROGENEOUS OIL FORMATION (EMBODIMENTS) 2023
  • Kobyashev Aleksandr Vyacheslavovich
  • Mazaev Vladimir Vladimirovich
  • Zakharenko Vladimir Aleksandrovich
  • Elaev Igor Olegovich
  • Kushnarev Igor Borisovich
  • Morozovskij Nikita Aleksandrovich
RU2822152C1
METHOD FOR IMPROVEMENT OF HYDRODYNAMIC COMMUNICATION OF WELL WITH PRODUCTIVE FORMATION 2011
  • Fajzullin Ilfat Nagimovich
  • Khurrjamov Al'Fis Mansurovich
  • Khurrjamov Bulat Al'Fisovich
  • Ramazanov Rashit Gaznavievich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Farid Bashirovich
RU2485296C1
METHOD OF RESTORATION OF WATER-FLOODED GAS OR GAS CONDENSATE WELL AFTER HYDRAULIC FRACTURING OF FORMATION 2019
  • Sarkarov Ramidin Akberbubaevich
  • Seleznev Vyacheslav Vasilevich
  • Radzhabova Alina Ramidinovna
RU2740986C1

RU 2 733 561 C2

Authors

Aflyatunov Rinat Rakipovich

Solovev Vyacheslav Anatolevich

Sekretarev Vladimir Yurevich

Dates

2020-10-05Published

2018-11-20Filed