FIELD: mining.
SUBSTANCE: invention relates to mining industry and can be used for recovery of flow rates and ensuring stable operation of production wells by means of hydraulic fracturing (HF) and fixing rocks of reservoirs. In the method of hydraulic fracturing and fastening of formations, a fracturing fluid is prepared containing an aqueous solution of medium-module liquid glass of the following composition, wt. %: sodium silicate - 17–20 and an acetone-alcohol solution consisting of anhydrous acetone and methyl alcohol in volume ratio of 0.4:1, with the following ratio of components, wt. %: said liquid glass solution - 75–85 and said acetone-alcohol solution - 15–25, it is pumped into formation in 30–40 minutes after preparation. When hydraulic fracturing is achieved for attachment of collector rocks to fracturing fluid, proppant is introduced in amount of 100–150 kg per 1 m3 of liquid and pumping solution fixer - water-alcohol solution of calcium chloride, containing alumomethylsiliconate sodium, with following ratio of components, wt. %: calcium chloride - 15.0–17.0; ethyl alcohol - 24.5–44.5; sodium aluminomethyl siliconate - 0.1–0.7, water is the balance.
EFFECT: technical result is ensuring productivity and stable operation of wells after hydraulic fracturing by increasing efficiency of mounting reservoir productive horizon rocks by maintaining permeability of rocks and reducing influx of formation water.
1 cl, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HYDRAULIC FRACTURING AND SUPPORTING OF LAYERS | 2013 |
|
RU2534374C1 |
METHOD OF HYDRAULIC FRACTURING AND ATTACHMENT OF FORMATIONS FORMED WITH LOOSE UNCEMENTED ROCKS | 2010 |
|
RU2416025C1 |
WET GAS OR GAS CONDENSATE WELL RECOVERY METHOD AND ITS DROWNING PREVENTION DURING ITS FURTHER OPERATION | 2013 |
|
RU2534291C1 |
METHOD OF RESTORATION OF WATER-FLOODED GAS OR GAS CONDENSATE WELL AFTER HYDRAULIC FRACTURING OF FORMATION | 2019 |
|
RU2740986C1 |
METHOD OF HYDRAULIC FRACTURING OF FORMATION IN CONDITIONS OF HIGH-DISSECTED HIGH-CONDUCTIVITY RESERVOIR WITH LOW STRESS CONTRAST OF BRIDGES | 2019 |
|
RU2737455C1 |
METHOD OF STABILISATION OF PRODUCING FORMATION WITH UNSTABLE ROCKS | 2011 |
|
RU2464410C1 |
METHOD OF FORMATION HYDRAULIC FRACTURING | 2014 |
|
RU2566357C1 |
HYDROFRACTURING METHOD FOR FORMATION IN WELL | 2014 |
|
RU2571964C1 |
DIFFICULT TURONIAN GAS PRODUCTION METHOD | 2020 |
|
RU2743478C1 |
METHOD OF OPERATION OF PRODUCTION AND WATER-BEARING FORMATIONS SEPARATED BY IMPERMEABLE INTERLAYER, WELL WITH HORIZONTAL SHAFTS AND CRACKS OF FORMATION HYDRAULIC FRACTURING | 2016 |
|
RU2630514C1 |
Authors
Dates
2021-03-11—Published
2019-12-23—Filed