METHOD OF OIL RESERVOIR DEVELOPMENT Russian patent published in 2021 - IPC E21B43/16 E21B43/12 

Abstract RU 2747200 C1

FIELD: oil industry.

SUBSTANCE: invention relates to the oil industry; it can be used in the development of heterogeneous productive reservoirs by wells with a horizontal end. According to the method, drilling or selection of an already drilled horizontal production well is carried out. The intervals of the productive reservoir are distinguished along the horizontal trunk of the producing well, which differ in their properties. The pump and the pump-compressor pipe pillar are lowered into the producing well to the mouth. The production of the producing well is lifted to the surface by a pump through the inner tube space. At the same time, a pre-drilled impact injection well is pre-drilled or selected. The intervals of the reservoir are distinguished along the trunk of the injection well, through which the corresponding intervals of the productive reservoir opened by the producing well are influenced. The layout is lowered into the injection well on the pump and compressor pipe pillar. It consists of a lower packer, a cross coupling, an upper packer, branch pipes, a valve equipment case with electric valves located in it to regulate and distribute the flow of the injection fluid flowing through the pump and compressor pipe pillar in each of the intervals and pressure gauges-thermometers for measuring the injection pressure in each of the intervals. In the injection well, the reservoir intervals are separated by a lower packer. The upper interval is cut off from the annulus space using the upper packer. With the help of coaxially arranged branch pipes and a cross coupling, independent channels are organized that hydraulically connect the electric valves and the corresponding intervals. Start of production and injection wells is carried out. In this case, the liquid is pumped into the injection well alternately in each of the intervals. The flow rate of the producing well is controlled and the interval in which the injection is carried out according to the time or pressure parameter is changed.

EFFECT: increase efficiency of oil reservoir development due to the organization of the injection control process in the influencing injection well.

2 cl, 2 dwg

Similar patents RU2747200C1

Title Year Author Number
METHOD OF DEVELOPING WELL OIL RESERVOIR WITH HORIZONTAL TERMINATION 2017
  • Petrov Vladimir Nikolaevich
  • Osnos Vladimir Borisovich
RU2667242C1
METHOD OF INCREASING PRODUCTIVITY OF DEVELOPMENT WELLS AND INJECTION CAPACITY OF INJECTION WELLS 2016
  • Zakirov Sumbat Nabievich
  • Drozdov Aleksandr Nikolaevich
  • Zakirov Ernest Sumbatovich
  • Drozdov Nikolaj Aleksandrovich
  • Indrupskij Ilya Mikhajlovich
  • Anikeev Daniil Pavlovich
  • Ostapchuk Sofya Sergeevna
RU2620099C1
METHOD OF DEVELOPING WELL OIL RESERVOIR WITH HORIZONTAL TERMINATION 2015
  • Khisamov Rais Salikhovich
  • Nazimov Nafis Anasovich
  • Salikhov Mirsaev Mirgazyamovich
  • Mukhliev Ilnur Rashitovich
  • Sagidullin Lenar Rafisovich
RU2590918C1
METHOD FOR ARRANGEMENT OF VERTICAL AND LATERAL FLOODING 2012
  • Zakirov Sumbat Nabievich
  • Anikeev Daniil Pavlovich
  • Zakirov Ehrnest Sumbatovich
  • Indrupskij Il'Ja Mikhajlovich
RU2531074C2
PROCESS AND GEAR FOR DEVELOPMENT AND CLEARING OF FACE ZONE OF WELLS BY PULSE DRAINAGE 1999
  • Nosov P.I.
  • Senochkin P.D.
  • Nurislamov N.B.
  • Zakiev M.G.
  • Minnullin R.M.
RU2159326C1
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD 2014
  • Zhuravlev Oleg Nikolaevich
  • Nukhaev Marat Tokhtarovich
  • Shchelushkin Roman Viktorovich
RU2594235C2
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD 2007
  • Shlein Gennadij Andreevich
  • Kuznetsov Jurij Alekseevich
  • Kotov Taras Aleksandrovich
RU2340769C1
METHOD AND DEVICE FOR FLUSHING WELL, TREATING FORMATION AND COMPLETING A WELL IN ONE TRIPPING OPERATION 2022
  • Akhmadeev Adel Rashitovich
  • Lukin Aleksandr Vladimirovich
  • Klimanov Vitalij Evgenevich
  • Nagumanov Marat Mirsatovich
  • Lubyshev Daniil Petrovich
  • Sukhanov Andrej Vladimirovich
  • Chenskij Vladimir Nikolaevich
RU2814516C1
WELL STRUCTURE AND METHOD OF MULTIPAY OIL POOL DEVELOPMENT 2007
  • Gorodnov Vladimir Pavlovich
  • Gorodnov Konstantin Vladimirovich
RU2344272C2
SURVEYING METHOD OF HORIZONTAL WELL 2013
  • Bazylev Aleksandr Petrovich
RU2515641C1

RU 2 747 200 C1

Authors

Khuzin Rinat Raisovich

Salikhov Dinar Albertovich

Andreev Vadim Evgenevich

Dubinskij Gennadij Semenovich

Pepelyaev Dmitrij Valerevich

Stefanovich Yurij Nikolaevich

Dates

2021-04-29Published

2020-07-28Filed