METHOD FOR COMPLETING A HORIZONTAL SIDETRACK BOREHOLE FOLLOWED BY MULTI-STAGE HYDRAULIC FRACTURING Russian patent published in 2022 - IPC E21B43/26 E21B33/13 

Abstract RU 2775628 C1

FIELD: gas and petroleum industry.

SUBSTANCE: invention relates to the petroleum and gas industry, more particular, to the field of completing horizontal sidetrack boreholes and hydraulic fracturing. To implement the method for completing horizontal sidetrack boreholes, followed by multi-stage hydraulic fracturing, a cemented completion arrangement configured to rotate during lowering and cementing is lowered on a transportation column. The arrangement consists of, from bottom to top: a casing shoe, two check valves or a double check valve, an activation coupling, a stop branch pipe, a stepped hydraulic fracturing coupling, a shank suspension, a polished cone. The shank suspension activated in the production string and the shank is continuously cemented with rotation. After waiting for the cement to harden and controlling the tightness of seal on the tubing string, a stinger is lowered and docked with the adapter, frac reinforcement for hydraulic fracturing is installed at the wellhead. An arrangement consisting of, from bottom to top: a packer plug, a setting tool, a compensator, 2 to 5 sections of a cumulative perforator and selective translators in between, a coupling locator, and a cable end, is lowered through the tubing string on a cable or a flexible pipe. An electrical signal is sent to the setting tool by means of a cable, and the packer plug is activated. The next signal is supplied, and the 1st section of the cumulative punch is activated, repeating for each section. The tool is lifted and inspected. The hydraulic fracturing stage with a volume of 150 tons and a speed from 10 to 16 m3/min is performed, followed by repeating along the entire length of the horizontal section of the borehole. By means of the coiled tubing fleet, the shank is normalised by milling the plugs using insoluble packer plugs or flushing the horizontal section of the borehole. The borehole is developed, the stinger is removed, operation equipment is lowered in the tubing.

EFFECT: increase in the productivity of the borehole.

1 cl, 13 dwg

Similar patents RU2775628C1

Title Year Author Number
METHOD FOR REPEATED MULTISTAGE HYDRAULIC FRACTURING IN A WELL WITH A HORIZONTAL TAILING-IN USING A CASING STRING OF A SMALLER DIAMETER 2021
  • Shamsutdinov Nikolai Maratovich
  • Milkov Aleksandr Iurevich
  • Leontev Dmitrii Sergeevich
  • Ovchinnikov Vasilii Pavlovich
  • Elshin Aleksandr Sergeevich
  • Slavskii Anton Igorevich
  • Chemodurov Igor Nikolaevich
  • Florinskii Ruslan Aleksandrovich
RU2775112C1
METHOD FOR MULTI-STAGE HYDRAULIC FRACTURING IN WELL WITH HORIZONTAL TERMINATION 2019
  • Shamsutdinov Nikolaj Maratovich
  • Bityukov Vladimir Valerevich
  • Sergeev Sergej Yurevich
  • Grigorev Andrej Petrovich
  • Leontev Dmitrij Sergeevich
  • Ovchinnikov Vasilij Pavlovich
RU2732891C1
METHOD FOR CONDUCTING HYDRAULIC FRACTURE TREATMENT IN INCLINED-DIRECTED OIL-PRODUCING WELL OPERATING TWO PRODUCTIVE FORMATIONS 2020
  • Shamsutdinov Nikolai Maratovich
  • Sergeev Sergei Iurevich
  • Bitiukov Vladimir Valerevich
  • Leontev Dmitrii Sergeevich
RU2752371C1
METHOD FOR CONDUCTING HYDRAULIC FRACTURING IN INCLINED-DIRECTIONAL OIL WELL OPERATING SINGLE PRODUCT RESERVOIR 2020
  • Shamsutdinov Nikolai Maratovich
  • Leontev Dmitrii Sergeevich
RU2750792C1
METHOD OF INTERVAL MULTISTAGE HYDRAULIC FRACTURING OF FORMATION IN OIL AND GAS WELLS 2016
  • Gimaev Artur Faatovich
  • Erenyakov Oleg Fedorovich
RU2634134C1
METHOD AND DEVICE FOR CARRYING OUT MULTI-STAGE HYDRAULIC FRACTURING OF FORMATION 2017
  • Pustovalov Mikhail Mikhajlovich
  • Ryabov Mikhail Mikhajlovich
RU2668209C1
METHOD OF WELL PREPARATION FOR HYDRAULIC FRACTURING OF RESERVOIR IN OIL AND GAS WELLS 2020
  • Postnov Timur Andreevich
  • Postnov Anton Andreevich
  • Semenov Mansur Magomedovich
RU2747033C1
SET OF EQUIPMENT FOR MULTI-STAGE HYDRAULIC FRACTURING 2022
  • Antipov Sergei Petrovich
  • Lebedev Artem Mikhailovich
  • Mardanshin Karim Marselevich
  • Sharafetdinov Elvir Anisovich
  • Osipov Aleksandr Sergeevich
RU2777032C1
METHOD FOR CONDUCTING MULTI-STAGE HYDRAULIC FRACTURING IN CONDITIONS OF THIN BRIDGES 2020
  • Pisarev Denis Yurevich
  • Kudrya Semen Sergeevich
  • Potyakov Sergej Vladimirovich
  • Martin Rajlans
  • Sidorov Dmitrij Aleksandrovich
  • Nyunyajkin Denis Vyacheslavovich
RU2759247C1
METHOD FOR OIL FORMATION DEVELOPMENT 2016
  • Kundin Aleksandr Semenovich
RU2630001C1

RU 2 775 628 C1

Authors

Shamsutdinov Nikolaj Maratovich

Milkov Aleksandr Yurevich

Elshin Aleksandr Sergeevich

Leontev Dmitrij Sergeevich

Dates

2022-07-05Published

2021-03-09Filed