FIELD: communication.
SUBSTANCE: invention relates to user equipment (hereinafter – UE) and a communication control method for UE. In UE, the first timer is connected to the same DNN as the first DNN provided by UE during a procedure for creation of the first session of a protocol data unit (hereinafter – PDU), the second timer is connected to the same S-NSSAI and the same DNN as the first S-NSSAI and the second DNN provided by UE during a procedure for creation of the second PDU session. UE is made with the possibility of not transmitting a message with a request for creation of a new PDU session for the same DNN as the first DNN until the first timer expires and not transmitting a message with a request for creation of a new PDU session for the same S-NSSAI and the same DNN as the first S-NSSAI and the second DNN until the second timer expires. A controller contained in user equipment is made with the possibility of starting the first timer and the second timer at the same time.
EFFECT: more flexible control of overload.
3 cl, 11 dwg
Title |
Year |
Author |
Number |
USER EQUIPMENT, METHOD FOR CONTROLLING COMMUNICATION FOR USER EQUIPMENT, CORE NETWORK DEVICE, METHOD FOR CONTROLLING COMMUNICATION FOR CORE NETWORK DEVICE, SMF, METHOD FOR CONTROLLING COMMUNICATION FOR SMF, UPF, AND METHOD FOR CONTROLLING COMMUNICATION FOR UPF |
2018 |
- Kawasaki Yudai
- Sugawara Yasuo
- Aramoto Masafumi
- Takakura Tsuyoshi
|
RU2770651C2 |
UE AND COMMUNICATION METHOD FOR UE |
2019 |
- Aramoto Masafumi
- Takakura Tsuyoshi
|
RU2797360C2 |
TERMINAL DEVICE AND CORE NETWORK DEVICE |
2018 |
- Kawasaki Yudai
- Sugawara Yasuo
- Aramoto Masafumi
- Takakura Tsuyoshi
|
RU2767983C2 |
TERMINAL DEVICE, AMF, SMF, REFERENCE NETWORK DEVICE AND COMMUNICATION MANAGEMENT METHOD |
2018 |
- Kuge Yoko
- Aramoto Masafumi
|
RU2760207C2 |
TERMINAL DEVICE, REFERENCE NETWORK DEVICE AND COMMUNICATION CONTROL METHOD |
2018 |
- Kawasaki Yudai
- Aramoto Masafumi
|
RU2762800C2 |
TERMINAL DEVICE, REFERENCE NETWORK DEVICE AND COMMUNICATION CONTROL METHODТЕРМИНАЛЬНОЕ УСТРОЙСТВО, УСТРОЙСТВО ОПОРНОЙ СЕТИ И СПОСОБ УПРАВЛЕНИЯ СВЯЗЬЮ |
2018 |
- Kawasaki Yudai
- Kuge Yoko
- Chiba Shuichiro
|
RU2746603C1 |
USER EQUIPMENT |
2019 |
- Aramoto, Masafumi
- Takakura, Tsuyoshi
|
RU2773240C1 |
TERMINAL DEVICE, REFERENCE NETWORK DEVICE, COMMUNICATION SYSTEM, AND COMMUNICATION MANAGEMENT METHOD |
2017 |
- Kuge Yoko
- Kawasaki Yudai
- Aramoto Masafumi
|
RU2749671C2 |
METHOD, AND DEVICE, AND USER EQUIPMENT FOR DISPLAY OF POLICIES |
2019 |
|
RU2787208C2 |
METHOD AND EQUIPMENT FOR ESTABLISHING SESSION |
2018 |
|
RU2776778C2 |