FIELD: oil production.
SUBSTANCE: invention relates to the field of oil production, namely to maintaining reservoir pressure by pumping fluid into the reservoir through injection wells. To implement the method for increasing the injectivity of the formation of an injection well, a pipe string with a packer and a saddle in the lower part is lowered into the production string of the well. The packer is set on the production string with the possibility of separating the lower part of the well from the upper part of the annulus. An instant ball is lowered into the pipe string and liquid is fed into it with an increase in pressure in the pipe string after the ball is seated on the seat with further dropping of the partially dissolved ball from the saddle to the bottom of the well. The packer is set on the production string above the perforation interval, the fluid is supplied to the pipe string from the existing pipeline pressure maintenance system of the injection well. When the ball lands on the seat, the liquid supply to the bottomhole formation zone is interrupted, the upper layer of the ball is dissolved and a short-term pressure pulsation is formed in the bottomhole formation zone at the moment the ball falls out of the saddle.
EFFECT: creation of a series of short-term pressure pulsations in the bottomhole formation zone.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INCREASING INJECTIVITY OF INJECTION WELL FORMATION | 2023 |
|
RU2813875C1 |
METHOD AND DEVICE FOR STRENGTHENING BOTTOM-HOLE ZONE OF GAS WELLS | 1995 |
|
RU2081296C1 |
DOWNHOLE EQUIPMENT FOR POLYFREQUENCY WAVE TREATMENT OF BOTTOM-HOLE ZONE OF PRODUCTIVE FORMATION AND FLOWRATE OSCILLATIONS GENERATOR FOR THAT | 2014 |
|
RU2574651C1 |
METHOD AND DEVICE FOR INITIATING INFLOW FROM STRATUM | 1993 |
|
RU2065948C1 |
WELL DEVICE FOR HEAT CARRIER INJECTION TO STRATUM | 2007 |
|
RU2334093C1 |
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2340769C1 |
RESERVOIR CLEANING AND COMPLETION DEVICE | 2014 |
|
RU2568615C1 |
METHOD OF GAS-ACIDIC OIL INFLOW STIMULATION IN OIL EXTRACTION AND INJECTION WELL BED | 2008 |
|
RU2391499C2 |
PROCEDURE FOR DEVELOPMENT OF RESERVOIR OF WELL BY SWABBING AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2436944C1 |
METHOD OF PRESSURE TESTING OF PUMP-COMPRESSOR PIPES IN WELLS WITH HORIZONTAL COMPLETION | 2023 |
|
RU2809394C1 |
Authors
Dates
2023-01-09—Published
2022-05-27—Filed