METHOD FOR DEVELOPING OIL DEPOSITS Russian patent published in 2023 - IPC E21B43/30 

Abstract RU 2788189 C1

FIELD: oil industry.

SUBSTANCE: invention relates to the oil industry, namely the development of oil deposits by a joint grid of injection, production and horizontal wells. The method for developing an oil deposit includes a seismic uplift arch, structure strike lines, drilling a prospecting or exploration well on a seismic uplift arch and conducting geophysical studies in it, determining reservoir properties of the formation, saturation of the formation with fluids, water-oil contact boundary - WOC. After determining the reservoir properties of the reservoir, the saturation of the reservoir with fluids, the boundaries of the WOC, the line AB is drawn through the arch of the uplift, the line AB, perpendicular to the strike line of the structure, and the line CD, located along the strike line of the structure, the lengths of the AB and CD lines are measured to the WOC line on the scale of the structural map, then the structure coefficient is calculated by the formula: Kstr= L1/L2, where L1 is the length of the CD line, L2 is the length of the AB line, then the total area of economically viable recoverable oil reserves is calculated for four vertical and one horizontal wells, then a rhombus with diagonals d1 and d2 is built , while the lengths of the diagonals d1 and d2 are determined by the formulas: , d2=d1⋅Kstr, where Srec is the area of economically viable recoverable oil reserves for four vertical and one horizontal wells, Kstr is the structure coefficient, as well as the lengths of the diagonals d1 and d2 are converted to the map scale, then one vertical injection well is placed at the corners of the rhombus, and in the middle of each side rhombus, a vertical production well is placed, then at the ends of the larger diagonal of the rhombus, circles are built with a radius equal to half the length of the side of the rhombus, then a horizontal production well is placed along the longer diagonal of the rhombus, while the bottomhole and the entrance to the formation of the horizontal production well are located at the points intersection of the diagonal of the rhombus with the circle, then on the structural map any one vertical production well located on the side of the rhombus is combined with the bottom hole point of the drilled exploratory or exploration well, while orienting the trunk of the horizontal production well of the rhombus parallel to the strike line of the structure, passing the first row of rhombuses is drawn along the strike line of the structure to the boundaries of the WOC, combining the sides of adjacent rhombuses and orienting the horizontal wellbores of the production wells of the rhombuses parallel to the strike line of the structure, then the required number of rows of rhombuses is designed until the entire area of the structure is filled up to the WOC line.

EFFECT: increasing the efficiency of oil deposit development, uniformity of oil reserves production, maintaining high rates of reservoir recovery due to the optimal location of the bottomholes of vertical injection, vertical and horizontal production wells along the area of distribution of the oil-bearing reservoir, as well as expanding technological capabilities.

1 cl, 4 dwg

Similar patents RU2788189C1

Title Year Author Number
METHOD FOR DEVELOPING OIL DEPOSITS WITH LOW-PERMEABILITY RESERVOIRS 2021
  • Iakupov Aidar Rashitovich
RU2760112C1
METHOD FOR DEVELOPING LOW PERMEABILITY OIL FIELD 2023
  • Iakupov Aidar Rashitovich
RU2795640C1
METHOD FOR DEVELOPING OIL DEPOSITS WITH LOW-PERMEABILITY RESERVOIRS 2022
  • Iakupov Aidar Rashitovich
RU2788182C1
METHOD FOR DEVELOPMENT OF A MULTI-LAYER OIL FIELD 2021
  • Iakupov Aidar Rashitovich
RU2770929C1
METHOD FOR DEVELOPMENT OF EXPLORED OIL DEPOSIT 2015
  • Khisamov Rais Salikhovich
  • Mironova Lyubov Mikhajlovna
  • Salikhov Mirsaev Mirgazyamovich
  • Sagidulliin Lenar Rafisovich
  • Mukhliev Ilnur Rashitovich
  • Danilov Danil Sergeevich
  • Petrov Vladimir Nikolaevich
RU2587661C1
DEVELOPMENT OF MINOR OIL DEPOSITS 2013
  • Khisamov Rais Salikhovich
  • Akhmetgareev Vadim Valer'Evich
  • Khannanov Mars Talgatovich
RU2524703C1
METHOD FOR DEVELOPMENT OF OIL RIM OF OIL AND GAS CONDENSATE RESERVOIR 2010
  • Zakirov Sumbat Nabievich
  • Indrupskij Il'Ja Mikhajlovich
  • Roshchina Irina Viktorovna
  • Zakirov Ehrnest Sumbatovich
  • Anikeev Daniil Pavlovich
RU2433253C1
METHOD FOR DEVELOPMENT OF OIL DEPOSIT BY HORIZONTAL WELL 2023
  • Iakupov Aidar Rashitovich
RU2818333C1
A METHOD OF DEVELOPMENT OF OIL POOL WITH LOW-PERMEABILITY RESERVOIRS 2002
  • Zakirov I.S.
  • Zakirov S.N.
  • Zakirov Eh.S.
RU2208140C1
METHOD FOR DEVELOPING MULTI-LAYER OIL DEPOSIT WITH HORIZONTAL WELL 2023
  • Iakupov Aidar Rashitovich
RU2810359C1

RU 2 788 189 C1

Authors

Iakupov Aidar Rashitovich

Dates

2023-01-17Published

2022-08-25Filed