FIELD: agriculture.
SUBSTANCE: method of slotting drained lands refers to the field of agriculture, and specifically to land reclamation. In the method, which includes the working passages of the slotter across the direction of the tubular drainage, on the drained lands, drained sections of the tubular drainage are delineated with a width of 5.5 to 7.5 depths of the tubular drains, across the direction of the tubular drainage, the working passages of the slotter are made with a depth of up to 55 cm and at the time of the working of the slotter passage within the selected pre-drained areas, finely dispersed copper pyrite powder, with a particle size of 0.03 to 0.08 mm, is fed to the bottom of the cavity trace of the slotter knife passage in the norm from 60 to 75 g/m.
EFFECT: suppressing the vital activity of iron bacteria and reducing the intensity of tubular drainage ochretization.
1 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PARA PLOUGHING DRAINED LANDS | 2014 |
|
RU2584444C1 |
METHOD OF CHISELING DRAINED LANDS | 2022 |
|
RU2790881C1 |
METHOD FOR DEEP LOOSENING OF DRAINED LANDS | 2022 |
|
RU2791509C1 |
METHOD OF MOLING OF DRAINED LANDS | 2022 |
|
RU2793256C1 |
METHOD OF ARRANGING MOLE DRAINAGE ON DRAINED LANDS | 2022 |
|
RU2791514C1 |
METHOD FOR MOLE PLOUGHING OF LANDS BEING DRAINED | 2016 |
|
RU2632096C1 |
METHOD FOR DEEP TILLAGE OF DRAINED SOILS | 2014 |
|
RU2585460C1 |
METHOD OF CHISELING DRAINED LANDS | 2014 |
|
RU2584443C1 |
METHOD OF ARRANGING MOLE DRAINAGE ON LANDS TO BE DRAINED | 2016 |
|
RU2632228C1 |
METHOD FOR CONSTRUCTION OF MOLE DRAINAGE ON DRAINED LANDS | 2014 |
|
RU2585461C1 |
Authors
Dates
2023-03-09—Published
2022-02-25—Filed