FIELD: oil industry.
SUBSTANCE: method includes the initial stop of water injection into the well, followed by the assembly of the injection line. Determine the preliminary injectivity of the well before treatment. A suspension of modified clay powder in water is pumped into the reservoir, then trisodium phosphate or “powdered sodium glass” is sequentially pumped, then a buffer slug of water in a volume of 5-10 m3 is pumped into the well, followed by pumping a solution of calcium chloride, followed by a buffer slug of water in the well of 5-10 m3, then a slug of a solution of trisodium phosphate or "powdered sodium glass" is pumped in.
EFFECT: isolating highly permeable interlayers for redistributing the filtration flows of injected water when regulating the process of developing oil deposits.
2 cl, 1 dwg, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL FIELD DEVELOPMENT | 2016 |
|
RU2648135C1 |
METHOD FOR DEVELOPMENT OF HETEROGENEOUS OIL FORMATION (EMBODIMENTS) | 2023 |
|
RU2822152C1 |
METHOD OF OIL POOL DEVELOPMENT | 2013 |
|
RU2528183C1 |
METHOD FOR DEVELOPING THE OIL DEPOSIT | 2017 |
|
RU2657904C1 |
METHOD OF DEVELOPING AN OIL DEPOSITE | 2020 |
|
RU2743744C1 |
METHOD OF DEVELOPMENT OF INHOMOGENEOUS OIL RESERVOIR (OPTIONS) | 2017 |
|
RU2652410C1 |
METHOD FOR OIL DEPOSIT DEVELOPMENT | 2021 |
|
RU2777820C1 |
DEVELOPMENT AND OIL RECOVERY IMPROVEMENT METHOD FOR INHOMOGENEOUS OIL POOLS | 2013 |
|
RU2536070C1 |
COMPOSITION OF REAGENT FOR DEVELOPMENT OF OIL FIELD BY FLOODING AND METHOD OF ITS APPLICATION | 2018 |
|
RU2693104C1 |
PROCEDURE LEVELING PROFILE OF ACCEPTANCE OF INJECTION WELLS | 2000 |
|
RU2175053C1 |
Authors
Dates
2023-04-04—Published
2022-02-21—Filed