FIELD: construction.
SUBSTANCE: invention is related in particular to a method of mounting a frame-arch structure covering prefabricated structures of one-story buildings for various purposes. The method for mounting a frame-arch structure includes attaching a rod to one of the supports, then the end of the next rod is hinged to the other end of the rod, the structure is lifted and turned around the support until the free end of the installed rod rests on the ground and the flange of the mounted assembly is closed, then the latter is fixed with bolts with the repetition of these operations with the rest of the rods.
EFFECT: acceleration of the installation process.
2 cl, 13 dwg
Title | Year | Author | Number |
---|---|---|---|
FRAME OF QUICK-ERECT STRUCTURE AND METHOD OF ITS INSTALLATION | 2014 |
|
RU2564292C1 |
SPATIAL COVERING OF TENT TYPE ON POLYGONAL PLANE | 2023 |
|
RU2816720C1 |
FRAME OF RAPIDLY ERECTED STRUCTURE AND METHOD OF ITS ASSEMBLY | 2010 |
|
RU2449093C2 |
METHOD OF MOUNTING FRAME-ARCHED STRUCTURE | 2015 |
|
RU2597216C1 |
METHOD FOR MOUNTING SPATIAL BLOCK OF COATING | 2019 |
|
RU2734967C1 |
CARCASS-TENT COAT | 2019 |
|
RU2703044C1 |
METHOD TO ERECT ARCHED BUILDING | 2011 |
|
RU2487978C1 |
METHOD FOR CONSTRUCTION OF ARCH BUILDING | 2014 |
|
RU2554630C1 |
METHOD OF ERECTING THE FRAMEWORK OF MULTIWAVE LATTICE DOME | 0 |
|
SU939679A1 |
METHOD FOR ERECTION OF ARCHED BUILDING | 2009 |
|
RU2423581C1 |
Authors
Dates
2023-06-16—Published
2022-01-31—Filed