FIELD: construction.
SUBSTANCE: invention is related in particular to construction of screw supports and construction of pile foundations. The screw pile includes a pile body with through grooves and a spiral part located on the pile body, made with a winding step of the spiral part equal to 0.5D-3D, where D is the body diameter, a supporting flange at the end of the pile body, a vertical stability element located between the spiral part and a sealing annular element and made in the form of a sleeve with bladed elements. On the pile body there is a movable element with threaded holes, made between the end face of the pile body and the support flange with through grooves, under which there is a sealing ring element. The spiral part is made with a diameter equal to 1.1D-10D, where D is the body diameter.
EFFECT: increase in the speed of screwing and the bearing capacity of piles.
1 cl, 10 ex, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
TELESCOPIC SCREW PILE WITH LEADER PILE | 2021 |
|
RU2763573C1 |
EXTENDABLE SCREW PILE AND METHOD FOR ITS ARRANGEMENT | 2021 |
|
RU2769003C1 |
INJECTION PILE AND THE METHOD FOR ITS INSTALLATION | 2021 |
|
RU2771363C1 |
SCREW PILE, SCREW PILE INSTALLATION METHOD, SCREW PILE DRIVING MEANS AND OPEN-CUT TUNNELING METHOD WITH THE USE OF SCREW PILE | 2005 |
|
RU2288326C1 |
SCREW PILE | 2005 |
|
RU2288325C1 |
SCREW PILE | 2014 |
|
RU2564714C1 |
FLEXIBLE PIPE AND FLEXIBLE PIPE END CONNECTION | 2018 |
|
RU2731980C2 |
SCREW PILE IN SOIL WITH DETACHABLE TIP | 2014 |
|
RU2571869C1 |
SCREW PILE AND PILE DRIVING METHOD | 2005 |
|
RU2305729C1 |
SCREW PILE | 2015 |
|
RU2583793C1 |
Authors
Dates
2023-08-22—Published
2022-08-13—Filed