FIELD: energy and construction.
SUBSTANCE: invention relates to the construction of wooden, lightweight steel, light alloy or composite prefabricated permanent or temporary power line supports, including in hard-to-reach areas, on soft soils, in simple and difficult weather conditions. A prefabricated support for a power line includes at least three bases that do not lie on the same straight line, including those connected by flexible or rigid connections, to which at least one pair of posts are hinged, equipped with telescopic links for adjusting the length, connected to each other above the level of the bases, although at least one horizontal beam and at least one strut, along the surface of which a winch included in the structure, due to the rope, can move the slide connected to the horizontal beam, realizing the self-lifting of the support from the ground to the design position only due to the interaction of its components without the use of external lifting and transport cars, tractors, aircraft, as well as lifting wires and lightning protection cables onto supports. A method for constructing such a support is also described.
EFFECT: possibility of erecting a power line support and installing traverses, insulating pendants, wires and lightning protection cables on it, including high voltage classes and large transitions, including on soft soils, particularly in difficult weather conditions, without drilling operations, without lifting and transport or traction machines external to the structure of the support (including helicopters and/or balloons) and without installing permanent and/or temporary anchors to secure the winch rope outside the support.
37 cl, 30 dwg
Title | Year | Author | Number |
---|---|---|---|
PREFABRICATED LIGHTWEIGHT SUPPORT FOR EMERGENCY RECOVERY WORK ON POWER LINES | 2022 |
|
RU2781646C2 |
METHOD OF MOUNTING A PERMANENT QUICK-ERECT LIGHTWEIGHT SUPPORT FOR EMERGENCY RECOVERY WORKS ON POWER TRANSMISSION LINES | 2021 |
|
RU2768534C1 |
PREFABRICATED LIGHT SUPPORT FOR EMERGENCY AND RESTORATION WORKS ON POWER LINES | 2015 |
|
RU2614180C1 |
INSULATING SUPPORT SUSPENSION OF WIRES OF OVERHEAD POWER TRANSMISSION LINE | 2014 |
|
RU2582663C2 |
FAST-MOUNT LIGHTWEIGHT SUPPORT MADE OF COMPOSITE MATERIALS FOR EMERGENCY RECOVERY OPERATIONS ON 35-220 KV OVERHEAD LINES (OPTIONS) | 2021 |
|
RU2754615C1 |
SUPPORTING STRUCTURE OF POWER TRANSMISSION LINE | 0 |
|
SU1707171A1 |
ANCHORED CORNER SUPPORT OF THREE-PHASE POWER TRANSMISSION LINE | 0 |
|
SU1276789A1 |
POWER TRANSMISSION LINE SUPPORT | 0 |
|
SU1048099A1 |
POWER TRANSMISSION LINE SUPPORT | 0 |
|
SU1416647A1 |
POWER TRANSMISSION LINE SUPPORT | 0 |
|
SU1010240A1 |
Authors
Dates
2023-10-31—Published
2023-03-14—Filed