FIELD: construction.
SUBSTANCE: invention relates to construction of wells, in particular to methods of preparing wells for cementing, drilled with oil-based drilling mud. Method of preparing wells drilled on a hydrocarbon-based drilling fluid for cementing includes lowering casing pipes into the well, flushing them with drilling fluid, sequential pumping of spacer fluids into the well, their squeezing into the annulus with grouting solution and displacement fluid with their complete displacement from the well and installation of grouting solution in the annular space in the required interval. After running in of the casing string and flushing with oil-based drilling fluid, three spacer fluids are injected into the well: dissolving, displacing and washing fluids.
EFFECT: increase in the volume of dense contact of the cement stone with the enclosing surfaces: casing string – cement stone, cement stone – rock in wells drilled on hydrocarbon-based drilling fluids, due to complete displacement of hydrocarbon-based drilling fluids and achieving maximum adhesion of cement stone with rock and casing from the well.
1 cl, 2 tbl, 3 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREPARATION FOR CEMENTING OF WELLS DRILLED USING INVERT-EMULSION DRILLING MUD | 2010 |
|
RU2452849C1 |
METHOD OF CEMENTING CASING PIPE OF GAS WELL UNDER CONDITIONS OF PERMAFROST ROCKS | 2006 |
|
RU2342517C2 |
PLUGGING MATERIAL FOR MAKING OF BRIDGES IN WELL DRILLED INVERTED-EMULSION DRILLING MUD (VERSIONS) | 2013 |
|
RU2525408C1 |
METHOD OF WELL STAGE CEMENTING UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES IN LOST CIRCULATION ZONE | 2000 |
|
RU2188302C2 |
METHOD OF CEMENTING CASING STRING IN WELL | 2023 |
|
RU2823955C1 |
METHOD TO FIX PROCESS WELLS OF UNDERGROUND STORAGES OF GASEOUS AND LIQUID HYDROCARBONS (VERSIONS) | 2015 |
|
RU2576416C1 |
METHOD OF FORMATION ISOLATION WITH CEMENT-SILICATE MUD | 2012 |
|
RU2519262C1 |
CASING STRING CEMENTING METHOD IN WELL | 2019 |
|
RU2720025C1 |
METHOD FOR CEMENTING THE CONDUCTOR, A TECHNICAL COLUMN DURING THE CONSTRUCTION OF WELLS | 2022 |
|
RU2792128C1 |
PROCESS OF ISOLATION OF ABSORBING AND WATER-SATURATED STRATA | 1990 |
|
RU2057900C1 |
Authors
Dates
2025-03-11—Published
2024-10-28—Filed