FIELD: mining industry, construction. SUBSTANCE: process of blasting operations includes blasting of family of charges, registration of vibrations of ground and check of parameters of blasts in family. Increased reliability of process is achieved due to provision for check of number and parameters of blasts of single charges in family. Blasts of single charges in family are carried out with moderation interval equal or exceeding period of least low-frequency component of vibrations of ground generated by blast. Check of parameters of blasts of charges in family is realized by way of analysis of results of registration of vibrations of ground with isolation of each blast by emergence of forward waves and amplitudes. In agreement with another version period of least low-frequency component of vibrations of ground generated by blast is determined by blasting of single shaped charge and registration of emerging vibrations. EFFECT: increased reliability of process.
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF RUNNING OF BLASTING OPERATIONS | 1985 |
|
SU1322834A1 |
METHOD FOR MODELLING OF EARTHQUAKE SEISMIC ACTION | 2007 |
|
RU2359289C2 |
METHOD OF SEISMIC PROSPECTING WITH USE OF ROCK HOLE CHARGES | 2003 |
|
RU2231093C1 |
METHOD OF TESTING EXPLOSION OSCILLATION SOURCE | 0 |
|
SU853577A1 |
SEISMIC PROSPECTING METHOD | 0 |
|
SU1132270A1 |
PROCESS OF HIGH-RESOLUTION SEISMIC PROSPECTING BY METHOD OF COMMON-DEPTH POINT WITH BLASTING OF CHARGES | 1997 |
|
RU2107310C1 |
METHOD TO IMPROVE SEISMIC RELIABILITY OF FOUNDATIONS | 2009 |
|
RU2406805C1 |
METHOD OF SEISMIC INSULATION OF STRUCTURAL FOUNDATIONS | 2009 |
|
RU2406803C1 |
BURSTING POINT STATION | 1998 |
|
RU2142149C1 |
DEVICE FOR SEISMIC SURVEY | 0 |
|
SU750410A1 |
Authors
Dates
1998-11-10—Published
1981-09-21—Filed