FIELD: power engineering. SUBSTANCE: dust preparing system has raw coal bin 2, gas-extracting stack with descending drying section 2, mill-fan 4 provided with dust separator 5, dust-gas stream advancing pipe-line 6, dust-gas flux divider connected with dust ducts 8 and 9 mounted inside the pipe-line, gas dust heater 12 mounted ahead burners 13 of boiler 14. Gas dust heater is equipped with muffle burner 11. EFFECT: improved quality of solid fuel. 1 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| FUEL PREPARATION SYSTEM | 0 |
|
SU1760251A1 |
| BOILER UNIT | 1990 |
|
RU2023212C1 |
| SYSTEM OF PREPARATION OF SOLID FUEL | 1992 |
|
RU2051313C1 |
| ONCE-THROUGH PULVERIZED-FUEL BURNER | 1991 |
|
RU2049292C1 |
| BOILER PLANT | 0 |
|
SU1451465A1 |
| METHOD AND DEVICE FOR BURNING LOW-REACTION POWDERED FUEL | 1991 |
|
RU2009402C1 |
| PRISMATIC WATER-COOLED FURNACE | 1992 |
|
RU2032853C1 |
| COAL-PULVERIZING SCREENED FURNACE | 0 |
|
SU1726895A1 |
| COAL PULVERIZATION SYSTEM | 0 |
|
SU1395904A1 |
| METHOD OF FUEL PREPARATION AT THERMAL POWER PLANT USING GAS PISTON ENGINE | 2024 |
|
RU2827332C1 |
Authors
Dates
1994-02-28—Published
1990-03-14—Filed