FIELD: mechanical engineering. SUBSTANCE: for testing power unit 2 whose capacity is lower main capacity additional tunnel is provided for gas tunnel 3; additional tunnel is built up of separate parts: converging tube 5, cylindrical part 6, and diffuser 7. Each separate section is provided with self-contained cooling system. Additional tunnel is secured in position by means of diaphragm 11 and mounted on movable supports 12. During tests of power unit additional tunnel and power unit assembly functions as ejector and creates vacuum in high-pressure chamber 1. EFFECT: additional tunnel reduces gas speed to subsonic value and recovers static pressure. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
BENCH FOR FIRING TESTS OF LIQUID-PROPELLANT ROCKET ENGINES | 2007 |
|
RU2349787C1 |
BENCH OF FIRING TRIALS OF LIQUID-PROPELLANT ROCKET ENGINES | 2008 |
|
RU2433296C2 |
LIQUID-PROPELLANT ROCKET ENGINE TEST METHOD | 1992 |
|
RU2050459C1 |
CYCLONIC SEPARATOR | 0 |
|
SU1768242A1 |
ANTENNA SETTING UP AND TAKING UP WINCH DRIVE AIR TURBINE | 2004 |
|
RU2276272C2 |
STAND FOR ALTITUDE TESTS OF ROCKET ENGINES | 2017 |
|
RU2646278C1 |
VACUUM TEST BENCH FOR SPACE LIQUID-PROPELLANT ENGINE FIRING TESTS | 2015 |
|
RU2602464C1 |
STEAM GENERATING GEAR | 1997 |
|
RU2127397C1 |
HEAT EXCHANGER TUBE | 1995 |
|
RU2111432C1 |
GAS CLEANING SEPARATION PLANT | 1991 |
|
RU2016630C1 |
Authors
Dates
1994-02-28—Published
1991-06-28—Filed