FIELD: mining industry. SUBSTANCE: central part of rock mass of interchamber pillar is caved in and shrinked inside U-shaped spatial structure which is formed from fencing pillars on side of adjacent worked out spaces and ceiling. After cutting of U-shaped structure from rocks of hanging and lying sides it is moved along vertical by layer-by-layer breaking of ore of fencing pillars and release of shrinked ore. Fouling of ore with breaking of stumps of U-shaped structure is prevented with ore junctions formed in advance with bed of interchamber pillar. EFFECT: improved efficiency when developing steeply dipping seams. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MINING ORE DEPOSITS | 0 |
|
SU1789698A1 |
METHOD FOR EXTRACTION OF THIN AND EXTREMELY THIN STEEP-FALLING AND SLANTING DEPOSITS | 2004 |
|
RU2255221C1 |
METHOD FOR MINING THICK DEPOSITS OF HARD ORES WITH INSECURE ROCKS | 0 |
|
SU1723324A1 |
METHOD FOR EXTRACTING THIN AND EXTREMELY THIN STEEP-FALLING AND SLANTED DEPOSITS | 2004 |
|
RU2255222C1 |
METHOD FOR EXTRACTION OF STEEP-FALLING AND SLANTING DEPOSITS OF LOW AND AVERAGE POWER | 2003 |
|
RU2247244C1 |
METHOD OF EXTRACTION OF MINERALS OF PILLARS | 2015 |
|
RU2610456C1 |
METHOD OF MINING SLOPING ORE DEPOSITS | 0 |
|
SU1620628A1 |
METHOD FOR UNDERGROUND MINING OF STEEPLY DIPPING THICK ORE BODIES | 2021 |
|
RU2757883C1 |
METHOD OF MINING ORE BODIES | 2023 |
|
RU2806860C1 |
METHOD FOR EXTRACTION OF STEEP-DROPPING AND SLANTING DEPOSITS OF LOWE AND AVERAGE MASSIVENESS | 2004 |
|
RU2254467C1 |
Authors
Dates
1994-04-15—Published
1991-08-16—Filed