FIELD: oil producing industry. SUBSTANCE: using exponential model of type , where is cumulative production of given well, thou. t; ti is time, months; A, B, α are equation coefficients which are to be determined. Should coefficient A > 0, B < 0, a < 0 isolating works in well are to be performed, and if A < 0, B > 0, a > 0 - forced fluid withdrawal is performed in well. Isolation is effected with the aid of bentonite grout. EFFECT: higher efficiency. 2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL POOL | 1990 |
|
RU2069259C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL FIELD | 1990 |
|
RU2012783C1 |
METHOD FOR DEVELOPING OIL DEPOSIT WITH FLOODED PROSTRATE | 1993 |
|
RU2046183C1 |
METHOD FOR SELECTIVE ISOLATION OF WATERED INTERVALS OF OIL BED | 1992 |
|
RU2085724C1 |
METHOD FOR ISOLATION OF WATER ENCROACHED BEDS | 1990 |
|
RU2013521C1 |
PROCESS OF EXPLOITATION OF OIL POOL | 1992 |
|
RU2057911C1 |
METHOD FOR DEVELOPMENT OF TERRIGENOUS OIL BED | 1994 |
|
RU2085711C1 |
METHOD OF DEVELOPING AN OIL DEPOSIT | 0 |
|
SU1553658A1 |
METHOD FOR FIELD DEVELOPMENT | 0 |
|
SU1796011A3 |
METHOD FOR DEVELOPMENT OF OIL BED | 0 |
|
SU1776300A3 |
Authors
Dates
1994-04-30—Published
1991-12-18—Filed