FIELD: construction. SUBSTANCE: formwork is moved from section to section at the section bottom level mark in the direction parallel to the facade of the next section. As the butt face of the formwork is aligned with the next section, the formwork is either rolled into the section on a transportation bogie or by turning the tunnel formwork wheels in the direction of motion parallel to the facade of the next section. EFFECT: improved construction technique. 3 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF CAST-IN-SITU BUILDINGS | 1992 |
|
RU2034121C1 |
METHOD FOR DISMANTLING FLOOR SHUTTERING | 1993 |
|
RU2074300C1 |
METHOD FOR ERECTING MONOLITHIC BUILDING IN TUNNEL-TYPE FRAMEWORK AND FRAMEWORK FOR ERECTING MONOLITHIC BUILDING | 1992 |
|
RU2065012C1 |
METHOD FOR CONSTRUCTION OF FLOORS IN MONOLITHIC BUILDINGS | 1992 |
|
RU2018603C1 |
TRESTLE | 1994 |
|
RU2062851C1 |
SET OF VOLUMETRIC-TRAVELING FORMS AND PROCESS OF ERECTION OF BUILDINGS WITH ITS USE | 2000 |
|
RU2194831C2 |
METHOD FOR CONSTRUCTION OF MONOLITHIC BUILDING | 1993 |
|
RU2065011C1 |
BUILDING | 1992 |
|
RU2017915C1 |
METHOD OF MOULDING OF MONOLITHIC WALLS AND FLOORS | 1993 |
|
RU2062774C1 |
SLIDING CONCRETE FORM | 1992 |
|
RU2040656C1 |
Authors
Dates
1994-05-15—Published
1991-11-27—Filed