FIELD: construction. SUBSTANCE: method consists in installation of forms of walls and floor, concreting of walls and floor, and subsequent removal of forms with rearrangement of formed floor onto temporary supports. Floor is concreted for self-carrying part of its thickness, then, after concreted part attains forms strength, this part is rearranged on temporary supports, and floor is formed finally up to design thickness. Prior to forming of floor to its design thickness, placed on its self-carrying part is heat and sound-proofing layer. EFFECT: higher efficiency. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF MONOLITHIC BUILDING | 1993 |
|
RU2065011C1 |
METHOD FOR CONSTRUCTION OF MONOLITHIC FOUNDATION | 1991 |
|
RU2011774C1 |
METHOD FOR ERECTING MONOLITHIC BUILDING IN TUNNEL-TYPE FRAMEWORK AND FRAMEWORK FOR ERECTING MONOLITHIC BUILDING | 1992 |
|
RU2065012C1 |
METHOD OF ERECTING BUILDING COVER OR OVERFLY STRUCTURE | 2015 |
|
RU2582682C1 |
METHOD OF MONOLITHIC BUILDING ERECTION AND MOVABLE FRAMEWORK FOR ITS REALIZATION | 1993 |
|
RU2078884C1 |
METHOD FOR SECTION-WISE ERECTION OF A MONOLITH FRAME | 1991 |
|
RU2012753C1 |
METHOD FOR ERECTION OF MONOLITHIC BUILDINGS IN WINTER TIME | 2007 |
|
RU2364690C2 |
METHOD FOR ERECTION OF CAST-IN-SITU BUILDINGS | 1992 |
|
RU2034121C1 |
METHOD OF ERECTING MONOLITHIC STRUCTURE | 0 |
|
SU1701869A1 |
METHOD OF MOULDING OF MONOLITHIC WALLS AND FLOORS | 1993 |
|
RU2062774C1 |
Authors
Dates
1994-08-30—Published
1992-09-15—Filed