FIELD: coal mines. SUBSTANCE: during equipment of hole 5, the hole mouth is deepened in filled ground to form working chamber 1. Casings 7 and 8 are additionally fastened by cramps 9 and 10 to hole surface casing 4. Hole clearance is sealed through specially installed injecting tubes 12 and 13 by injection at pressure. After installation of equipment, working chamber 1 and installed equipment are preserved with subsequent filling of chamber with water-retaining solution - water swelling polymeric mineral composite 24. From atop the working chamber is closed by metal patch 23. EFFECT: higher efficiency in provision of reliable sealing. 2 cl, 1 dwg