FIELD: development of oil field. SUBSTANCE: method includes drilling of wells spaced in geometric pattern presenting two regular hexagons turned relative to each other through 30 deg. with producing wells located on sides, in corners and centers of hexagons. Additional wells are drilled to expose discontinuous formation and located inside inner hexagons symmetrically to outer hexagon. Producing wells are perforated stage by stage. After breakthrough of injected agent into producing wells located in corners of inner hexagon, the second stage is started. Subjected to exposure is entire producing section in wells located on sides of outer hexagon, with their treatment up to breakthrough of displacing agent and subsequent transition to injection. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF HYDROCARBON POOLS OF COMPLICATED GEOLOGICAL STRUCTURE | 1992 |
|
RU2030567C1 |
BOREHOLE RUNNING IN METHOD | 1992 |
|
RU2039217C1 |
METHOD TO DEVELOP OIL POLL WITH OIL-IN-WATER SYSTEMS | 2009 |
|
RU2387812C1 |
METHOD OF OIL FIELD DEVELOPMENT WITH HORIZONTAL WELLS | 2014 |
|
RU2550642C1 |
METHOD FOR DEVELOPING OIL DEPOSITS | 2023 |
|
RU2812976C1 |
PROCESS OF DEVELOPMENT OF LITHOLOGICALLY SCREENED OIL- SATURATED LENSES BY TWO WELLS | 2001 |
|
RU2203404C2 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1992 |
|
RU2067165C1 |
MULTIPAY OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2530005C1 |
METHOD OF DEVELOPING OIL DEPOSIT WITH CARBONATE FISSURED RESERVOIRS | 2002 |
|
RU2196885C1 |
METHOD OF OIL POOL DEVELOPMENT WITH GAS CAP AND BOTTOM WATER | 2008 |
|
RU2386804C1 |
Authors
Dates
1994-05-15—Published
1990-12-25—Filed