FIELD: oil and gas industry.
SUBSTANCE: the method includes drilling of inclined wells penetrating several pays, completion of productive pays, equipment of the well for dualing of the completed pays, extraction of product through producers and injection of a working agent through injectors. Penetration of the pays by inclined wells is made with permanent zenith and azimuth angles in order to receive a crew-shaped well. Before completion oil-bearing sections of the well in the productive strata are identified. At that in the wells equipped with devices for dualing isolation is performed between the penetrated sections of the well by means of feed-through packers.
EFFECT: improving oil recovery of the deposit.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
MULTI-SITE OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2459935C1 |
DEVELOPMENT METHOD OF MULTI-OBJECT OIL DEPOSIT (VERSIONS) | 2018 |
|
RU2696690C1 |
METHOD FOR OIL DEPOSIT IN CARBONATE RESERVOIRS COMPLICATED BY EROSIVE CHANNEL | 2016 |
|
RU2630324C1 |
METHOD FOR DEVELOPING DEPOSITS IN LAYERED RESERVOIRS | 2022 |
|
RU2787503C1 |
RECOVERY METHOD OF OIL DEPOSIT IN CARBONATE RESERVOIRS, COMPLICATED BY THE EROSIVE CHANNEL | 2016 |
|
RU2626483C1 |
METHOD OF DEVELOPING TWO OBJECTS OF DIFFERENT STRATIGRAPHIC ACCESSORIES | 2017 |
|
RU2652240C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT IN CARBONATE COLLECTORS COMPLICATED WITH EROSION CUT | 2010 |
|
RU2434124C1 |
METHOD OF DEVELOPMENT OF OIL POOLS OBSTRUCTED BY EROSION TRENCH | 2007 |
|
RU2334087C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT | 2010 |
|
RU2414590C1 |
DEVELOPMENT METHOD OF PRODUCTIVE FORMATION WITH LOW-PERMEABILITY SECTION | 2012 |
|
RU2485291C1 |
Authors
Dates
2014-10-10—Published
2013-06-26—Filed