FIELD: mining. SUBSTANCE: when driving working, two leading zones of camouflet blasting of rocks are formed. One zone within design outline of working, and the other, beyond the design outline. Formed between two zones of blasted rocks is ring-shaped pillar. Working driving is carried out with use of light explosive charges that reduces intensity of seismic effect on rocks adjacent to zone outlines. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PROFILED BREAKING OF ROCKS | 1991 |
|
RU2023878C1 |
METHOD OF FORMATION OF CUTTING CAVITY | 1992 |
|
RU2081392C1 |
METHOD FOR CONTROL OF HEAVING OF MINE WORKING FLOOR | 1991 |
|
RU2019705C1 |
METHOD FOR INSTALLATION OF SCREW-IN ANCHOR | 1990 |
|
RU2017972C1 |
METHOD OF CONTROLLING FLOOR HEAVING IN MINE WORKINGS | 0 |
|
SU1751349A1 |
METHOD FOR BREAKING ROCKS | 0 |
|
SU1818521A1 |
METHOD FOR MINING OUTBURST-PRONE COAL SEAMS | 0 |
|
SU1795118A1 |
METHOD FOR FIXING ANCHOR IN ROCKS | 0 |
|
SU1652593A1 |
RELIEF OF ROCK-BUMP AND STRUCTURALLY DISORDERED DEPOSITS | 2014 |
|
RU2573663C1 |
METHOD OF MINING OF THICK HARD ROCKS DEPOSITS AT GREAT DEPTHS | 2001 |
|
RU2186980C1 |
Authors
Dates
1994-05-15—Published
1991-02-11—Filed