FIELD: underground mining operations. SUBSTANCE: method includes hole drilling in working floor to detect layer of plastic rocks by geological data, and camouflet blasting in this layer. Plastic rocks are consolidated to form hollow into which overlaying rocks are caved. In so doing, zone is formed in working floor filled with loose rock mass possessing high yielding. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONTROLLING FLOOR HEAVING IN MINE WORKINGS | 0 |
|
SU1751349A1 |
METHOD FOR PROTECTION OF WORKINGS FROM ROCK PRESSURE | 1991 |
|
RU2012804C1 |
METHOD OF FORMATION OF CUTTING CAVITY | 1992 |
|
RU2081392C1 |
METHOD FOR FIXING ANCHOR IN ROCKS | 0 |
|
SU1652593A1 |
REINFORCEMENT METHOD OF MINE WORKINGS WITH ANCHOR SUPPORT IN ROCKS PRONE TO SOIL HEAPING | 2010 |
|
RU2444629C1 |
METHOD FOR SUPPORTING SOIL OF MINE WORKINGS | 2011 |
|
RU2459907C1 |
METHOD FOR PROFILED BREAKING OF ROCKS | 1991 |
|
RU2023878C1 |
METHOD FOR REINFORCEMENT OF MINES SOIL | 2011 |
|
RU2468207C1 |
METHOD FOR INSTALLATION OF SCREW-IN ANCHOR | 1990 |
|
RU2017972C1 |
METHOD FOR BREAKING PILLARS IN DEVELOPMENT OF LOW-CAPACITY DEOSITS | 0 |
|
SU1666711A1 |
Authors
Dates
1994-09-15—Published
1991-04-02—Filed