FIELD: well drilling. SUBSTANCE: determined prior to well drilling is coefficient of effect of drilling bit type on crooking of wellbore by multiplication of rock anisotropy indices obtained in drilling of wellbore by drag bit up to appearance of its crooking and subsequent drilling with bit having minimal tooth up to appearance of wellbore crooking. Then, interval deepening of vertical and crooking wells is effected with constant bit load and deviation of wellbore and instantaneous increment of zenith angle value is determined in compliance with relation given in invention description. On course of drilling, diameter of centralizer is measured and centralezers are replaced as they wear out. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
DIRECTED SLANT DRILLING METHOD | 1992 |
|
RU2047723C1 |
METHOD OF WELL DIRECTIONAL DRILLING OF DEFLECTING TOOL WITH GUIDE ROD | 2001 |
|
RU2204681C1 |
METHOD OF SINKING OF DIRECTIONAL WELLS | 1990 |
|
RU2027842C1 |
METHOD OF REDUCING ZENITH ANGLE OF CROOKED WELLS | 0 |
|
SU1379444A1 |
METHOD FOR DIRECTED DRILLING OF INCLINED WELLS WITH GUIDE ROD | 1992 |
|
RU2065020C1 |
METHOD OF CONTROL OF WELL SHAFT TRAJECTORY (ITS VARIANTS ) | 1991 |
|
RU2006560C1 |
ASSEMBLY OF BOTTOM OF DRILL STRING FOR DRILLING OF OFFSHOOTS FROM HORIZONTAL PART OF UNCASED WELL | 2019 |
|
RU2715482C1 |
METHOD OF CROOKING A HOLE WITH PIVTOAL DEFLECTOR | 0 |
|
SU1590536A1 |
PROCEDURE FOR CONSTRUCTION OF HORIZONTAL WELL IN DEVONIAN STRATA | 2009 |
|
RU2421586C1 |
METHOD FOR WELL CONSTRUCTION | 2012 |
|
RU2494214C1 |
Authors
Dates
1994-06-30—Published
1991-03-14—Filed