FIELD: oil and gas production.
SUBSTANCE: procedure for construction of horizontal well in Devonian strata consists in driving vertical section, section of initial curve with inclination angle built-up according to project, sections of inclination angle built-up coming to horizontal and in drilling horizontal borehole. To reduce probability of drilling tool freeze-in clay of Kynovsk horizon is driven at inclination angle αentr less, than 60°. Also, if inclination angle αentr is 50-60°, then a casing string is lowered into a borehole with entry into upper limestone and cemented. If inclination angle αentr is 45-40° and less, than a borehole is cased with a casing string and cemented after there is reached a bottomhole of a well of the pay horizon by drilling according to a project profile. Actual value of inclination angle of entry into upper limestone on floor of Kynovsk horizon αentr is determined with distance from upper limestone to a project oil reservoir A and radius of curve R at reaching curve in this interval to a required value according to formula: αentr=arc sin (1-A/R), where αentr is inclination angle of entry into upper limestone on floor of Kynovsk horizon, in degrees. A is a distance from upper limestone to a project oil reservoir, m, R is radius of drift angle build-up in the interval from upper limestone to a project oil reservoir, m, when value of A is reached at allowed value of intensity of curve for a given drill tool and casing string assembly.
EFFECT: reduced probability of drill tool freeze-in, reduced period of construction of well, reduced material expenditures.
2 cl, 1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION METHOD OF WELL SHAFT THROUGH UNSTABLE CLAY MINE ROCKS | 2012 |
|
RU2474669C1 |
HORIZONTAL WELL CONSTRUCTION METHOD | 2013 |
|
RU2532494C1 |
WELL CONSTRUCTION METHOD IN COMPLEX GEOLOGICAL CONDITIONS | 2018 |
|
RU2704089C1 |
METHOD OF HORIZONTAL WELL CONSTRUCTION IN SECTIONS OF UNSTABLE STRATA (VERSIONS) | 2012 |
|
RU2507371C1 |
METHOD FOR WELL CONSTRUCTION | 2012 |
|
RU2494214C1 |
METHOD OF WELL CONSTRUCTION IN COMPLICATED MINING AND GEOLOGICAL CONDITIONS FOR DRILLING AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2531409C1 |
PROCEDURE FOR WELL CONSTRUCTION | 2010 |
|
RU2411336C1 |
METHOD FOR CONSTRUCTION OF WELLS ON THE TERRIGENOUS DEVONIAN DEPOSITS OF THE ROMASHKINO OIL FIELD | 2020 |
|
RU2745493C1 |
CONSTRUCTION OF OIL PRODUCTION WELL | 2013 |
|
RU2524089C1 |
METHOD OF DRILLING HORIZONTAL WELLS WITH PILOT SHAFT | 2015 |
|
RU2587660C1 |
Authors
Dates
2011-06-20—Published
2009-12-14—Filed