FIELD: construction. SUBSTANCE: method includes construction of vertical shaft, drilling of ray horizontal holes from the shaft, installation of filters in holes and withdrawal of drainage water. First, horizontal hole of largest length is drilled with simultaneous study of lithological, granulometric and water permeable characteristics of rocks and their location with reference to preset direction of hole. Parameters of each subsequent horizontal hole and the type of its filter are corrected with consideration of more accurately defined rock water permeability in holes drilled beforehand. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
BUILDING METHOD OF WATERTIGHT SCREEN IN BUILT-UP AREAS | 2007 |
|
RU2349710C1 |
METHOD FOR HORIZONTAL DRAINING OF WATERLOGGED STRUCTURES ON PILE FOUNDATIONS | 2012 |
|
RU2539447C2 |
DRAINAGE METHOD | 0 |
|
SU1740680A1 |
METHOD FOR WATER RESOURCE PROTECTION BY MEANS OF HORIZONTAL (INTERFORMATION) CUTOFFS AND CUTOFF ERECTION TECHNIQUE | 2007 |
|
RU2347034C1 |
METHOD FOR SOIL DRAINING | 0 |
|
SU1715985A1 |
METHOD OF CONSTRUCTING RADIAL DRAIN OF LOW-STRENGTH TUBULAR FILTERS | 0 |
|
SU1392194A1 |
METHOD OF BUILDING RADIAL DRAINS | 0 |
|
SU1747602A1 |
RADIAL DRAINAGE SYSTEM | 1991 |
|
RU2016176C1 |
DOWNHOLE FILTER RISE RADIAL DRAINAGE OF NEAR-SIDEHILL SITES | 2016 |
|
RU2636159C1 |
METHOD OF HORIZONTAL RADIAL DRAIN HOLE CONSTRUCTING IN HARD ROCKS | 2007 |
|
RU2337244C1 |
Authors
Dates
1994-08-30—Published
1992-09-07—Filed