FIELD: construction. SUBSTANCE: drainage wells are radially arranged in the shaft. Water- receiving shafts are connected with water-collecting shaft and arranged on the higher level in relation to it. Water-removing pipes and water-lifting pump are installed in the water-collecting shaft. Suction ends of siphon water conduits are arranged in the water-receiving shafts, discharge ends being equipped with starting pumps and valves and arranged in the water-collecting shaft. EFFECT: enhanced efficiency of drainage of industrial sites and town territories. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
RADIAL DRAIN | 0 |
|
SU1791547A1 |
DRAINAGE METHOD | 0 |
|
SU1740680A1 |
METHOD FOR PROTECTION FROM UNDERFLOODING OF BUILT-UP AREA UNDER CONDITIONS OF ITS COMPOSITION OF INHOMOGENEOUS ROCKS | 1992 |
|
RU2018563C1 |
HYDRAULIC-MINE DUMP OF INDUSTRIAL WASTE | 2003 |
|
RU2252295C2 |
METHOD FOR SOIL DRAINING | 0 |
|
SU1715985A1 |
METHOD OF DRAINING OF TUBELIKE MINERAL DEPOSIT | 2008 |
|
RU2382144C1 |
METHOD OF BUILDING RADIAL DRAINS | 0 |
|
SU1747602A1 |
METHOD OF EXTINGUISHING FIRE ON FOREST AND PEAT ARRAYS | 2015 |
|
RU2594148C1 |
HYDRAULIC FILL SECTION FOR INDUSTRIAL WASTE STORAGE | 2004 |
|
RU2262566C1 |
METHOD FOR WATER-INTAKE STRUCTURE ERECTION | 2006 |
|
RU2310047C1 |
Authors
Dates
1994-07-15—Published
1991-07-01—Filed