FIELD: hydraulic borehole mining. SUBSTANCE: before starting wash-out, formed at formation roof is slotted opening corresponding to design dimensions of chamber. The latter is filled with material with positive buoyancy in water. Initial area is subjected to wash-out through its entire thickness. Rock is removed by successive undercutting of each layer at the foot of circular stope and wash out of rock layer sliding to foot. In course of mining, additionally fed to gob is material with positive buoyancy. Device has flexible tie in form of chain of articulated plate links with longitudinal trough. Tie, and air and pulp-feeding hoses are accommodated inside water hole. Pulp feeding hose is located in trough. EFFECT: higher efficiency. 2 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BOREHOLE MINING OF THICK UNDERGROUND | 2000 |
|
RU2182227C2 |
METHOD OF BOREHOLE MINING OF THICK UNDERGROUND FORMATIONS | 2000 |
|
RU2182665C2 |
EQUIPMENT FOR HYDRAULIC RECOVERY OF MINERAL DEPOSITS FROM WELLS | 0 |
|
SU1776797A1 |
METHOD FOR UNDERGROUND HYDRAULIC MINING OF MINERALS AND A DEVICE FOR ITS IMPLEMENTATION | 2022 |
|
RU2778118C1 |
METHOD FOR UNDERGROUND HYDRO MINING OF MINERALS AND THE DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2763162C1 |
METHOD FOR BORE MINING OF UNDERGROUND MINERAL FORMATIONS | 2004 |
|
RU2278973C1 |
METHOD OF BOREHOLE MINING OF THICK UNDERGROUND FORMATIONS | 2000 |
|
RU2182228C2 |
PROCESS OF HYDRAULIC MINING OF SOLID MINERAL RESOURCES THROUGH HOLES | 2001 |
|
RU2181160C1 |
HYDRAULIC BORE MINING OF MINERALS | 2016 |
|
RU2640611C2 |
METHOD OF BOREHOLE MINING OF BURIED PLACER | 1995 |
|
RU2097564C1 |
Authors
Dates
1994-08-30—Published
1990-04-18—Filed