FIELD: industry of building materials. SUBSTANCE: method involves measuring the resilience of mix in the course of forming, and amplitude and vibration frequency of vibration mold. As resilience becomes equal to, or higher than, 0.5-2 kg/sq cm, the forming process is continued. The moment of stopping the forming process termination is determined by reduction of mold amplitude and increase its vibrations by at least 2-3 times. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION FOR FORMATION OF TWO-LAYER CONSTRUCTION ARTICLES | 0 |
|
SU1811489A3 |
INSTALLATION FOR MAKING CONCRETE BLOCKS | 1991 |
|
RU2036787C1 |
DEVICE FOR MAKING ARTICLES OF CONCRETE MIXES | 1991 |
|
RU2036788C1 |
VIBRATORY MOLDING MACHINE FOR MANUFACTURING OF CONCRETE BLOCKS | 1991 |
|
RU2033321C1 |
METHOD FOR PRODUCTION FERTILIZER OF MANURE | 1991 |
|
RU2040514C1 |
DEVICE FOR MANUFACTURE OF CONCRETE PRODUCTS | 0 |
|
SU1823813A3 |
VIBROPRESSING MACHINE FOR MANUFACTURE OF CONCRETE BLOCKS | 1991 |
|
RU2036084C1 |
METHOD OF CONTROL OF THE PROCESS OF VIBROMOULDING OF CELLULAR CONCRETE MIXTURE | 0 |
|
SU737833A1 |
ARRANGEMENT FOR CHECKING COMPACTION OF CONCRETE MIX | 0 |
|
SU1530450A1 |
METHOD OF SEMIFINISHED SLAG (CONCRETE) BLOCKS STOWAGE FOR DRYING | 2002 |
|
RU2225290C2 |
Authors
Dates
1994-08-30—Published
1991-12-27—Filed