FIELD: material-handling engineering. SUBSTANCE: crane is mounted on wheeled chassis which carries rotatable platform with pivotally connected tower with boom. Tower is coupled by assembling hydraulic cylinder with rotatable platform. Boom has middle and head sections. One end of flexible link is attached to rotatable platform, another end is connected to head section of boom, in this case it is reeved to roller fixed in tower and to roller fastened on end of middle section of boom. End of flexible link is fastened on rotatable platform with the aid of compensator. EFFECT: enhanced operating reliability. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
LIFT SPEED LIMITER | 1991 |
|
RU2034766C1 |
TOWER CRANE | 0 |
|
SU1796583A1 |
TOWER CRANE | 0 |
|
SU1787928A1 |
TOWER CRANE | 2011 |
|
RU2492132C2 |
LOAD CRANE | 0 |
|
SU1789498A1 |
0 |
|
SU1782919A1 | |
0 |
|
SU436014A1 | |
TOWER CRANE AND METHOD FOR ITS ASSEMBLY | 2008 |
|
RU2371374C1 |
CARGO HANDLING CRANE | 0 |
|
SU1227591A1 |
METHOD FOR ERECTING CRANET WITH TELESCOPIC TOWER | 0 |
|
SU1025657A1 |
Authors
Dates
1994-09-15—Published
1991-05-12—Filed