FIELD: well completion. SUBSTANCE: metal powder is preliminarily suspended in water-repelling fluids injected into well and forced in borehole to formation porous space in form of homogeneous suspension-emulsion system. To reduce terms of creation of depression, suspension-emulsion system is injected into well and forced through borehole by portions of 100-500 l by alternating them with portions of surfactant aqueous solution so that interval between separate portions of suspension-emulsion system measures 200-1000 m. Used as amphoteric metal is aluminium powder, and water-repelling fluid is used in form of oil or products of its processing, or syloxanes. Aqueous solution of alkalis and acids are used as activators. EFFECT: simplified creation of depression, improved reservoir properties of formation borehole zone, and uniform distribution of metal powder in activator. 3 cl, 1 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD OF LAUNCHING WELL OPERATION | 0 | 
 | SU717296A1 | 
| DEVICE FOR WELL TREATMENT | 1998 | 
 | RU2148162C1 | 
| FROTH-FORMING COMPOSITION | 1993 | 
 | RU2061859C1 | 
| METHOD FOR SHUTOFF OF WATER INFLOWS IN OIL WELL | 1995 | 
 | RU2088746C1 | 
| METHOD OF PROCESSING FACE ZONE OF SEAM | 1984 | 
 | RU1233555C | 
| METHOD OF EXTRACTING RESIDUAL OIL | 1993 | 
 | RU2065940C1 | 
| WELL DEVELOPMENT METHOD | 2004 | 
 | RU2272897C1 | 
| METHOD FOR DEVELOPING OIL DEPOSITING CARBONATE COLLECTORS OF FISSURE-CAVITY TYPE | 1992 | 
 | RU2073791C1 | 
| METHOD FOR COMPLETION OF WELL | 0 | 
 | SU1838589A3 | 
| METHOD FOR WELL COMPLETION | 1989 | 
 | SU1653407A1 | 
Authors
Dates
1994-09-15—Published
1990-02-05—Filed