FIELD: well completion. SUBSTANCE: metal powder is preliminarily suspended in water-repelling fluids injected into well and forced in borehole to formation porous space in form of homogeneous suspension-emulsion system. To reduce terms of creation of depression, suspension-emulsion system is injected into well and forced through borehole by portions of 100-500 l by alternating them with portions of surfactant aqueous solution so that interval between separate portions of suspension-emulsion system measures 200-1000 m. Used as amphoteric metal is aluminium powder, and water-repelling fluid is used in form of oil or products of its processing, or syloxanes. Aqueous solution of alkalis and acids are used as activators. EFFECT: simplified creation of depression, improved reservoir properties of formation borehole zone, and uniform distribution of metal powder in activator. 3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LAUNCHING WELL OPERATION | 0 |
|
SU717296A1 |
DEVICE FOR WELL TREATMENT | 1998 |
|
RU2148162C1 |
FROTH-FORMING COMPOSITION | 1993 |
|
RU2061859C1 |
METHOD FOR SHUTOFF OF WATER INFLOWS IN OIL WELL | 1995 |
|
RU2088746C1 |
METHOD OF PROCESSING FACE ZONE OF SEAM | 1984 |
|
RU1233555C |
METHOD OF EXTRACTING RESIDUAL OIL | 1993 |
|
RU2065940C1 |
WELL DEVELOPMENT METHOD | 2004 |
|
RU2272897C1 |
METHOD FOR COMPLETION OF WELL | 0 |
|
SU1838589A3 |
METHOD FOR DEVELOPING OIL DEPOSITING CARBONATE COLLECTORS OF FISSURE-CAVITY TYPE | 1992 |
|
RU2073791C1 |
METHOD FOR WELL COMPLETION | 1989 |
|
SU1653407A1 |
Authors
Dates
1994-09-15—Published
1990-02-05—Filed