FIELD: construction. SUBSTANCE: method includes making holes in hollow-core reinforced concrete slab in support zones from atop slab and from below in slab span between adjacent hollows. Between holes on slab lower surface, a groove is made. Then, guides are installed with inclination from hole in support zone to hole in span, and flexible reinforcement is introduced. Guides are withdrawn, and stops are installed on slab upper surface, and spacer is placed into groove on slab lower surface, and reinforcement is stressed. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF STRENGTHENING ASSEMBLED REINFORCEMENT MULTI- HOLLOW PANELS OF CEILING | 1992 |
|
RU2023839C1 |
METHOD FOR REINFORCING OF PRECAST HOLLOW-CORE SLABS | 1991 |
|
RU2020235C1 |
0 |
|
SU1783101A1 | |
METHOD FOR REINFORCEMENT OF PRECAST REINFORCED CONCRETE HOLLOW-CORE SLAB OF FLOOR | 0 |
|
SU1815322A1 |
METHOD OF STRENGTHENING SECTIONAL FERROCONCRETE MULTI-CAVITY PANELS OF CEILING | 0 |
|
SU1812289A1 |
METHOD FOR REINFORCING OF PRECAST MULTIHOLLOW FLOOR PANELS | 1992 |
|
RU2015275C1 |
METHOD FOR BUILDING FLOOR PANEL RECONSTRUCTION | 2006 |
|
RU2347047C2 |
METHOD FOR REINFORCEMENT OF REINFORCED CONCRETE MULTICAVITY PANEL OF BUILDING FLOOR | 2009 |
|
RU2398944C1 |
DEVICE FOR REINFORCEMENT OF MULTI-CAVITY PANEL OF BUILDING FLOOR | 2009 |
|
RU2394970C1 |
PREFABRICATED MONOLITHIC REINFORCED CONCRETE FRAME OF MULTI-STOREY BUILDING | 2023 |
|
RU2805483C1 |
Authors
Dates
1994-09-30—Published
1991-04-22—Filed