FIELD: construction.
SUBSTANCE: device includes installed pulled reinforcement rods equipped with reinforcement items and installed into panel channels. Each installed pulled reinforcement rod is arranged of reinforcement items. Reinforcement items include separate sections of reinforcement coupled with turnbuckle, permanent end anchors and anchor distribution plates. Sections of pulled reinforcement rod are installed in cavity channels of panel via horizontal holes. Horizontal holes are cut in middle part of panel lower shelf along axis of symmetry of cavity channels. Permanent end anchors of pulled reinforcement rod are installed in near-support part of panel and are equipped with distributing plates. Plates are placed into vertical narrow slots cut in upper shelf and inner ribs of panel.
EFFECT: recovery of main operational characteristics of reinforced panel.
14 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REINFORCEMENT OF REINFORCED CONCRETE MULTICAVITY PANEL OF BUILDING FLOOR | 2009 |
|
RU2398944C1 |
REINFORCEMENT ITEM | 2009 |
|
RU2394968C1 |
METHOD FOR MANUFACTURING OF REINFORCEMENT ITEM | 2009 |
|
RU2395650C1 |
METHOD FOR BUILDING FLOOR PANEL RECONSTRUCTION | 2006 |
|
RU2347047C2 |
DEVICE FOR REINFORCING REINFORCED-CONCRETE FLOOR PANELS | 2008 |
|
RU2388882C1 |
LARGE-PANEL EARTHQUAKE-PROOF BUILDING | 0 |
|
SU1767137A1 |
DEVICE FOR COMPRESSED MEMBER RECOVERY | 2005 |
|
RU2308583C2 |
METHOD OF REINFORCING REINFORCED-CONCRETE FLOOR PANELS | 2008 |
|
RU2388883C1 |
ANCHORING DEVICE FOR STRESSED REINFORCEMENT STRUTS FIXATION | 2005 |
|
RU2308582C2 |
METHOD FOR PRESTRESSED REINFORCEMENT CROSS-PIECE ANCHORING | 2005 |
|
RU2315158C2 |
Authors
Dates
2010-07-20—Published
2009-04-28—Filed