FIELD: oil production with use of sucker-rod pumping units, both, in vertical and inclined and directional wells. SUBSTANCE: method consists in increasing pressure at wellhead by closing flow line valve with operating pumping unit. Pumping unit is stopped with upper position of horsehead and wellhead pressure drop curve is registered. Wellhead pressure is raised again up to initial pressure and pumping unit is stopped with horsehead in lower position and second curve of pressure drop is registered. Value of fluid leakage through leaky lift string when pump plunger pair is leaky is determined by formula. Should no leakage be detected through plunger pair, leakage through leaky lift string is determined qualitatively by the intensity of pressure drop for time period. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SUCKER-ROD PUMPING UNIT WITH TWO-CYLINDER PUMP | 2005 |
|
RU2293216C1 |
HYDRAULIC SUCKER-ROD SUBMERSIBLE PUMP DRIVE | 2005 |
|
RU2347064C2 |
PUMPING UNIT FOR OIL RECOVERY FROM DEEP WELLS | 1998 |
|
RU2150024C1 |
METHOD FOR OPERATING AND REPAIRING A WELL EQUIPPED WITH A DOWNHOLE ROD PUMPING UNIT IN CONDITIONS COMPLICATED BY A DECREASE IN THE PRODUCTIVITY OF THE BOTTOMHOLE FORMATION ZONE | 2022 |
|
RU2787502C1 |
DEVICE FOR CLEANING DOWN-HOLE EQUIPMENT FROM ASPHALT-RESIN-PARAFFIN DEPOSITS | 1998 |
|
RU2154153C2 |
INSTALLATION OF ELECTRIC SUBMERSIBLE HYDRAULIC PISTON PUMP | 2015 |
|
RU2605789C2 |
BOREHOLE PUMPING UNIT | 0 |
|
SU1015113A1 |
ELECTRIC SUBMERSIBLE GEAR PUMP INSTALLATION | 2018 |
|
RU2746292C2 |
WELL SUCKER-ROD PUMPING UNIT FOR PETROLEUM PRODUCTION | 0 |
|
SU1341383A1 |
GROUND POWER UNIT OF DEEP-WELL PUMP, MOSTLY HYDROPISTON OR JET, FOR LIFTING OF FLUID FROM WELL WITH APPLICATION OF WORKING FLUID ENERGY | 2008 |
|
RU2357099C1 |
Authors
Dates
1994-11-15—Published
1991-03-05—Filed