FIELD: civil engineering. SUBSTANCE: method involves placing and levelling the preheated concrete mix in the mold and compacting it partly by vibration. After placing the preheated mix, its temperature shall not exceed 60-65 C. Then cold mix is placed on top of it at a temperature of 10-30 C in a layer 20-40 mm thick. Next, temperature of heated mix is measured in the mold, a vacuum shield is placed on the levelled surface and the mix is vacuumized at a vacuum whose value is determined by the formulas Pр≅ P
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MAKING CONCRETE ARTICLES | 0 |
|
SU815708A1 |
CONCRETE MIXTURE CONTINUOUS TREATMENT METHOD AND DEVICE | 1992 |
|
RU2008216C1 |
METHOD OF MOULDING BUILDING ARTICLES | 0 |
|
SU1570897A1 |
METHOD OF MANUFACTURE OF LARGE-SIZED CONCRETE AND REENFORCED CONCRETE ARTICLES UNDER RIGOROUS CLIMATIC CONDITIONS | 1993 |
|
RU2121917C1 |
METHOD OF MOULDING CONCRETE AND REINFORCED CONCRETE ARTICLES | 0 |
|
SU1609662A1 |
METHOD FOR MANUFACTURE OF CELLULAR CONCRETE PRODUCTS | 1992 |
|
RU2035295C1 |
METHOD FOR MAKING CONCRETE AND FERROCONCRETE PRODUCTS | 0 |
|
SU1708802A1 |
METHOD OF MANUFACTURING ARTICLES FROM MOVING CONCRETE MIXES | 0 |
|
SU730568A1 |
METHOD OF PRODUCING CONCRETE ARTICLES | 0 |
|
SU856797A1 |
METHOD OF PRODUCING CONCRETE ARTICLES | 0 |
|
SU1433803A1 |
Authors
Dates
1994-12-15—Published
1991-06-13—Filed