FIELD: mining. SUBSTANCE: method includes opening and arrangement of peats, working of deposit untouched sections by adjacent successive runs with dredging machinery to extract rocks in face and formation of heaps of depleted sands in the wake of dragline, and repeated dredging of placer. Repeated dredging of placer is carried out on placer part near float up to filling up the residual reserves with dredging wastes. After primary working of placer untouched sections, dredger is backed from the face to dredging wastes by idling. Then, the residual reserves on the part near float are dredged by repeated run. EFFECT: higher efficiency. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DREDGE DEVELOPMENT OF TECHNOGENIC RESERVES | 2020 |
|
RU2723839C1 |
METHOD FOR PLACER MINING | 1992 |
|
RU2039271C1 |
RESERVES IN THE WORKING SIDES DREDGING DEVELOPMENT METHOD | 2018 |
|
RU2674452C1 |
METHOD FOR DRAINAGE DEVELOPMENT OF PLACERS | 2018 |
|
RU2681168C1 |
METHOD FOR ARTIFICIAL DEVELOPMENT OF TECHNOGENIC RESERVES | 2019 |
|
RU2700152C1 |
METHOD OF REPEATED DREDGING OF TECHNOGENIC PLACER | 2002 |
|
RU2215875C1 |
DREDGING METHOD | 2019 |
|
RU2708742C1 |
METHOD FOR RE-DEVELOPMENT OF GRAVEL DEPOSITS | 2011 |
|
RU2457330C1 |
DEVELOPMENT METHOD OF SHALLOW PERMAFROST TERRACE PLACERS ABOVE FLOOD-PLAIN IN CONDITIONS OF REPEATED DRAGGING | 2009 |
|
RU2420659C2 |
METHOD FOR MINING DIFFICULT-TO-DREDGE PLACERS | 1990 |
|
SU1788267A1 |
Authors
Dates
1994-12-15—Published
1990-01-30—Filed