FIELD: load hoisting and conveying equipment. SUBSTANCE: hook assembly comprises hook connected with loop. The latter passes through crosspiece and is fastened by nut. Hook assembly pulleys are mounted on a two-section pin. Metal structure of hook assembly is made up of two parallel sideplates interconnected at ends and in the middle symmetrically to vertical axis of hook assembly and perpendicularly to sideplates by at least two pairs of vertical plates with holes for installation of pin with pulleys. End plates are connected to internal plates. Crosspiece journals rest on supports. Axles of pins and crosspiece are arranged relatively square to each other. Sideplates and longitudinal members are joined by bridges between internal plates. EFFECT: easier manufacture and smaller height. 7 dwg
Title | Year | Author | Number |
---|---|---|---|
BOOM VARIABLE RATIO LOAD SHEAVE-BLOCK | 1995 |
|
RU2078020C1 |
TOWER CRANE | 2003 |
|
RU2260557C2 |
HOOK SUSPENSION | 2015 |
|
RU2655591C2 |
TIPPING CROSSPIECE | 0 |
|
SU1082745A1 |
HOOK SUSPENSION | 0 |
|
SU1174364A1 |
CRANE LOAD-LIFTING MECHANISM | 0 |
|
SU1794882A1 |
HOOK SUSPENSION | 0 |
|
SU1481184A1 |
DEVICE FOR JOINING LOAD-GRIPPING MEMBERS WITH ROPES OF CARGO HOIST | 0 |
|
SU1203002A1 |
METHOD OF HANDLING OF CONTAINERS | 2013 |
|
RU2554908C2 |
DEVICE FOR BLADE ASSEMBLY | 2020 |
|
RU2742357C1 |
Authors
Dates
1994-12-30—Published
1990-02-26—Filed