FIELD: water-development works. SUBSTANCE: berthing facility includes course laying of metal containers with cylindrical them which are filled with soil and soil cement. EFFECT: enhanced reliability. 6 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDRAULIC STRUCTURE | 2005 |
|
RU2289651C1 |
REINFORCEMENT FOR STRENGTHENING WEAK FOUNDATION | 1991 |
|
RU2032020C1 |
BLOCK FOR WATER-DEVELOPMENT WORKS | 1991 |
|
RU2026454C1 |
CITY EMBANKMENT | 2020 |
|
RU2738902C1 |
MOORING EMBANKMENT OF VERTICAL TYPE | 2018 |
|
RU2690426C1 |
BLOCK COURSED MASONRY WALL OF SEA GUARD STRUCTURE | 0 |
|
SU658209A1 |
WHARF EMBANKMENT | 0 |
|
SU1576631A1 |
HOLLOW CONCRETE MASS | 0 |
|
SU1733551A1 |
GABION FOR REINFORCING BANK SLOPES (VARIANTS) | 2021 |
|
RU2773499C1 |
WATER-DEVELOPMENT MASSIVE BRICK-WORK | 0 |
|
SU1813828A1 |
Authors
Dates
1995-01-09—Published
1991-03-29—Filed