FIELD: building engineering. SUBSTANCE: method lies in the following: load-bearing walls are erected for the height of a floor, a slab of the lower floor ceiling is made, inventorial columns are installed and the mentioned above slab is hoisted on them up to the rated mark. After the ceiling slab is connected with the load-bearing walls, the latters are built up by one floor. Inventorial supports with carrying capability exceeding the load from the freshly molded slab are brought into contact with the ceiling slab on the columns. On the fixed ceiling the ceiling slab of the next floor is formed. After that the process is repeated with the alternate erection of the load-bearing wall on the floor and hoisting of one ceiling slab. EFFECT: lowered cost of civil engineering and installation works. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ERECTING BUILDINGS AND CONSTRUCTIONS | 0 |
|
SU1805193A1 |
PROCESS OF ERECTION OF MULTILEVEL UNDERGROUND STRUCTURE ( VARIANTS ) | 2003 |
|
RU2220258C1 |
METHOD FOR BUILDING STRUCTURES BY LIFTING FLOOR SLABS | 0 |
|
SU1728442A1 |
METHOD FOR ERECTING BUILDING FRAME WITHOUT GIRDERS BY MEANS OF FLOOR LIFTING | 2002 |
|
RU2233953C2 |
METHOD OF COMBINED BUILDING OF UNDERGROUND AND ABOVE-GROUND PART OF FRAME STRUCTURE | 2017 |
|
RU2657565C1 |
METHOD OF ERECTING BUILDINGS BY LIFTING FLOORS AND CEILINGS | 0 |
|
SU821671A1 |
METHOD TO ERECT MULTISTORY SUBSURFACE STRUCTURE | 2009 |
|
RU2414563C1 |
METHOD FOR DISMANTLING A BUILDING | 1993 |
|
RU2057235C1 |
METHOD OF ERECTING BUILDINGS BY HOISTING PREMANUFACTURED STOREYS | 0 |
|
SU1747642A1 |
0 |
|
SU552395A1 |
Authors
Dates
1995-01-20—Published
1992-01-14—Filed