FIELD: oil production. SUBSTANCE: preventer and inlet section of lubricator with well instrumentation placed in it are installed on mouth valve. The instrumentation has cable portion connected to it. Preventer is closed after pressure between inlet section and well are levelled. Then pressure is blown off in the inlet section and the section is removed. Free end of the cable portion is connected to logging cable of elevator. Sealing fixture and guiding roll are installed on the preventer and then the instrumentation is descended down to the preset depth. EFFECT: more effective investigation of wells. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS SYSTEM FOR GEOPHYSICAL SURVEY OF INCLINED AND HORIZONTAL WELLS WITH EXCESSIVE PRESSURE AT WELLHEAD AND METHOD OF ITS USE | 2011 |
|
RU2491422C2 |
DEVICE FOR PERFORMANCE OF ROUND-TRIP OPERATIONS IN WELL | 1992 |
|
RU2041335C1 |
SYSTEM FOR REMOTE SAFETY MONITORING DURING WIRELINE WELL SERVICES IN EXISTING GAS WELLS | 2022 |
|
RU2810668C1 |
DEVICE FOR RUNNING OF INSTRUMENTS INTO WELL HIGH WELLHEAD PRESSURE | 1990 |
|
RU2041349C1 |
DEVICE FOR LOWERING CABLE INTO WELL | 2018 |
|
RU2694453C1 |
DEVICE FOR LOWERING OF GEOPHYSICAL CABLE OF "RIGID" STRUCTURE TO WELL UNDER HIGH PRESSURE | 2020 |
|
RU2736743C1 |
METHOD OF WELL HEAD PRESSURISING AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2357067C1 |
ARRANGEMENT FOR RUNNING INSTRUMENTS INTO WELL | 0 |
|
SU1221332A1 |
LUBRICATOR DEVICE FOR WELL TESTING | 0 |
|
SU1541377A1 |
METHOD FOR GEOPHYSICAL SURVEY OF HORIZONTAL WELLS WITH INCLINED WELLHEAD | 2023 |
|
RU2814136C1 |
Authors
Dates
1995-02-27—Published
1991-10-25—Filed